The Subject Of The Public Contract Is The Execution Of Construction Works In Rychvald On Roads Ii/471 And Iii/4712, Mk Záblatská And Adjacent Plots, Consisting In The Construction Of A Roundabout With Four Branches, Which Will Enable A Smooth Traffic Connection Of Both Roads, As Well As The Connection Of Mk Ul. Záblatská. The Building Is Divided Into The Following Buildings: Paid From The Ssmsk Budget: • So 101 Circular Intersection Of Roads Ii/471 X Iii/4712 The Construction Object Includes The Area Of The Existing Intersection Of Roads Ii/471 X Iii/4711, With The Fact That The Iii/47111 Road In The Direction Of Dolní Lutyně Will Also Be Solved Within The Object. The Intersection Is A Connection, As The Main Road Is Marked Ii/471, The Intersection Is Connected To Ul. Záblatská. The Reconstruction Will Change The Existing Intersection Into A Small Roundabout. Communication Iii/4711 Has A Width Of 7.5 M. • So 102 Communication Ii/471, K. At. Rychvald This Is The Section Between The Existing Intersection Ii/471 X Iii4711 And The Reconstructed Part Of Road Ii/471. The Reconstructed Part Of The Road Has A Width Of 8 M Between The Curbs. As Part Of The Construction, It Will Happen To Move The Axis Of The Road Towards The New Roundabout. • So 103 Communication Ii/471, K. At. Bohumín Záblatí This Is The Section Between The Roundabout And The Intersection With Road Iii/4711 (Sokolská Street). Communication Is Provided With A One-Sided (Left Side) Sidewalk With A Width Of 2.0 M. As Part Of The Construction, This Sidewalk Will Be Preserved And The Road Will Be Widened On One Side So That The Width Of The Paved Part Between The Curbs Is Min. 7.0. As Part Of The Construction, The Existing Drainage Ditch Will Be Backfilled And Drainage Of The Road Will Be Through Storm Drains Connected To The Existing Storm Sewer. • So 301 Rainwater Drainage The Building Permit Project Deals With The Drainage Of Rainwater From The Area Of The Newly Realized Roundabout, Bus Stop And Extended Road Ii/471 In The Direction Of Bohumín. Part Of The Construction Object Are Proposals For The Location Of Street Drains And Inspection Manholes. The Construction Object Solves The Drainage Of Rainwater From The Communication Of The Newly Built Sidewalk. The Newly Designed Storm Drain Is Gravity-Fed With A Slope Of Min. 0.5% From Ribbed Pvc Pipe Dn 250/200 - Type Ultra Rib 1.250/200 - Type Ultra Rib 1 • Other Costs 70% • Vrn Additional Budget Costs 70% Paid From The Budget Of The City Of Rychvald: • So 104 Bus Stop As Part Of The Construction, The Bus Stop Will Be Moved Outside The Area Of The Road. The Proposed Bus Stop Is Located In An Area That Is Precisely Determined In The Spatial Plan Of The City Of Rychvald And Included In The Section Of Road Transport Infrastructure. Communication In The Area Of The Stop Is Designed To Be One-Way (Arrival From The Intersection And Exit To Ul. Bohumínská). In The Area Of The Bus Stop, There Are Two Parallel Roads Divided By A Platform. • So 105 Local Communication Ul. Záblatská This Is The Section Between The Roundabout And The Existing Road At Ul. Záblatská, Embankment And Earth Body Excavation Will Be Carried Out To The Level Of The Level Of The Communication Plain. • So 403 Switching And Protection Of Public Lighting The Construction Of The Vo Closely Follows The Construction Of The Road And The Sidewalk Around The Road, Complementing This Construction O Infrastructure - Public Lighting. The Existing Lighting Fixtures Are Placed On Concrete Columns. As Part Of The Construction, The Existing Lighting In The Area Of The Bus Bay Will Be Supplemented And To Illuminate All Pedestrian Crossings. • So 801 Recultivation And Vegetation Treatment Of Areas After Construction During The Preparation Of The Area For Construction, It Will Be Necessary To Remove Mature Trees And Woody Encroachment In The Area Of The Planned Construction, Especially In The Area Of The Bus Stop. Cutting Down The Trees Will Open Up The Space And Create An Increased Noise Level For The Family House, Which Is Located In The Immediate Vicinity Of The Stop. The Space Between The Stop And The Fence Of The Rd Will Be Provided With Longitudinal Planting Of Coniferous Trees. Planting Is Proposed On The Plot Par. No. 2035. • Other Costs 30% • Vrn Additional Budget Costs 30% So 401 Overlay And Protection Of Lv Lines And So 402 Overlay And Protection Of Cetin Lines Are Not Priced. The Construction Will Be Carried Out According To The Project Documentation Prepared By The Authorized Person Ida Macháčková, Kašparova 1395/8, 700 30 Ostrava – Hrabůvka, Ičo 00095711 – Čkait 1102714.
Contact Information
Address
Úprkova795/170223Ostrava
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91348054
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.