The Project Will Result In Raising The Existing Vault Structure 2-Feet Above 100-Year Base Flood Elevation (Bfe) To Eliminate The Potential For Sediment And Debris Entering The System During Flood Events At The Hickory Log Creek Pumping Station. Raising The Gate Stems And Equipping The Existing 30-Inch Intake Slide Gates Located At The Vault With Electric Actuators With Remote Control. The Project Includes Mobilization, Access Inside The Gate Vault And Pump Station, Concrete And Brick Masonry Construction, Installation Of New Electric Actuators, Replacement Of Existing Gate Stems, Electrical Improvements, And Installation Of New Ladders, Stairs, Railing, Security Gate, And Hatches. A Condition Assessment Of The Four (4) Existing Gates And Frames Is Included In The Work Along With The Responsibilities Of Dewatering And Flood Protection For The Existing Intake Gate Vault During Construction.
Contact Information
Contact Person
Daniel Smith
Contact No.
7705697038137
Email
daniel.smith@r2tinc.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91348017
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.