Tender For Road Safety Work In Kam-18 Near Tiera On Chandauli Chakia Road - Scarifying the existing bituminous surfaceto a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 2 Cleaning and grubbing road land including uprooting wild vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cutearliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . 2.3/201 (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 3 Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. as per MORT&H specification No. 305 (sr. no. 3.16)(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 4 Construction of Granular sub-base by providing coarse grade material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in palce method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 5 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water, at OMC in mechanical mix plant carriage of mixed Material by tipper to site,1% OPC cement and 3.5% Emulsion laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 7 Providing and applying tack coat with bitumen emulsion (VG10) usingpressure distributor at the rate of 0.20 kg per sqm on the prepared surface cleaned with Air compressureas per techical specification clause 503. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 8 Providing and laying dense graded bituminous macadam with 100-200 TPH batch type HMP producing an avarage output of 75 tonne per hour using crused aggregates of specified grading premixed with bituminous binder @ 4.0 to 4.50 percent by weight of total mix and filler , transporting the hot mix to work site , layig with hydostatic paver finisher with sensor control to the required grade , level and aligmnment , rolling with smooth wheeled , vibratory and tendom roller to achieve the desired compaction as per MoRT&H Specification Clause 507 complete in all respects.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 9 Providing and applying tack coat with bitumen emulsion (VG10) usingpressure distributor at the rate of 0.20 kg per sqm on the preparedbituminoussurface cleaned with mechanical broomas per techical specification clause 503.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 10 Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 11 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 12 Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 13 Stone masonry work in cement mortar 1:3 for Foundation complete as per drawing and Technical Specifications(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 14 Stone masonry work in cement mortar 1:3 for Substructure complete as per drawing and Technical Specifications(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 15 R.C.C.with M-20 cement,coarse sand & 20mmsize stone aggregate including s/o all material labour T&P etc required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 16 Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 17 Struck pointing with cement mortar consisting of 1 part cement and 2 parts of sand of 1.25 including supply of all materials labour and T & P etc. required for proper completion of the work. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
|