The Investments Include, Among Others: I. Construction Works: 1. Construction Of 3 Chemical Warehouses With A Ventilation System And Means Of Protection And Safety Of Staff, Ii. Installation Works: 1. Disassembly And Disposal Of 2 Pieces Of Steel Filters, Diameter 1800 Mm, 2. Disassembly Of Pumps And Installations,3. Delivery And Assembly Of An Overflow Tank V = 20 M3 (Made Of Pp Plates, Welded) With Piping, Protection With A System Of Probes And Pump Protection, 4. Delivery And Installation Of Pre-Filters (2 Modules On Frames With 3 Disk Filters), 5. Delivery And Installation Of Ultrafiltration Filters (3 Modules On Frames With 3 Filters With Uf Membranes) With A Capacity Of Q = 81 M3/H.6. Delivery And Installation Of The Pump Q = 90 M3/H, H = 20 M H2o, P = 7.5 Kw,7. Disassembly Of The Existing Water Circulation System In The Pool Basin Made Of Steel Pipes And Pehd Fittings,8. Construction Of A Pressure Pipeline System Connected To The Filtration System By A Flange,9. Construction Of Piping On The Pressure Side From The Filters To The Inlets (40 Existing Nozzles) From Glued Pvc,10. Construction Of Gravity Piping From Existing Drains In Overflow Gutters 2 X 25 M Made Of Pvc,11. Implementation Of Automatic Installation Of A Station For Measuring Free Chlorine, Combined Chlorine, Ph, Redox, With Control Of Disinfection And Correction Of Water Ph And Coagulation, Ensuring Appropriate Technical Conditions Of The Rooms,12. Construction Of A New Water Supply From The Waterworks To The Area Of The Overflow Tank And Warehouses,13. Construction Of A Sewage System In The Area Of The Water Treatment Station With Connection To The Existing Sewer After It Has Been Camerad And Cleaned/Unblocked,14. Inspection And Possible Renovation Of Existing Heat Exchangers And Their Relocation To A New Location Along With Connecting The Heating Medium To The Exchangers And The Installation Of Automatic Temperature Control And Overheating Protection,15. Construction Of A New Electrical Switchboard For Circulation Pumps And Regulation Probes, Power Supply For The Disinfection Station, Ph Correction, Water Coagulation And Temperature Regulation, Along With Protection Of The Heating Node And Connection To The Existing Main Switchboard,16. Installation Of Water Circulation Installations In Entrance Shower Trays, 17. Installation Of A Photometer Set For Water Quality Testing,18. Delivery And Installation Of A Uv Lamp/Reactor With Power Supply And Control,19. Disassembly Of Other Non-Functioning Or Unnecessary Devices From The Existing Water Treatment Plant.Iii. Deadline For Task Completion: Up To 60 Days From The Date Of Conclusion Of The Contract. Iv. The Contractor Performing Activities Related To The Execution Of The Order Is Obliged To Employ People Under An Employment Contract, I.E. People Performing Activities Under This Order, Where The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974, Labor Co
|