1. The Subject Of The Order Is The Design And Development Of The Area At Ul. Kwiatowa/Piaskowa Together With The Expansion And Renovation Of The Storm Sewage System. The Contractor Is Obliged To Design, Obtain All Necessary Consents, And Build The Site Equipment In Accordance With The Fup, Taking Into Account The Planned Purpose And Function Of The Project, In Accordance With The Requirements Of Generally Applicable Law (Including Local Law), Standards And Technical Knowledge And Construction Art. The Contractor Will Be Obliged To Obtain The Necessary Opinions, Arrangements, Technical Conditions, Consents And Decisions, As Well As To Equip The Site With All Necessary Devices, Horizontal And Vertical Markings And Construction Facilities. The Project Will Include Demolition Works And Dismantling Of Existing Facilities, Hardening, Fencing And Infrastructure. Underground Colliding With The Planned Facilities And Installations. The Total Area Of The Land Intended For Transformation In Connection With The Implementation Of The Investment Is Up To Approx. 2,331 M 2 (The Entire Plot No. 281/24) General Scope Of The Project: - Gazebo 1 Pc, - Pergola 1 Pc, - Brine Graduation Tower 1 Pc, - Concrete Benches 19 M, - Concrete Seats (Poufs) 12 Pcs, - Garbage Bins 4 Pcs, - Bicycle Racks 9 Pcs., - Information Boards 2 Pcs., - Access Restrictor Posts 20 Pcs., - Chess Tables With Seats 5 Pcs., - Solar Led Park Lanterns 14 Pcs., - Monitoring 1 Set, - Flower Beds, Trees, Bushes 1 Set, - Permeable Paved Surfaces 1,199.78 M2, - Concrete Tunnels 2 Pcs. .,- Irrigation System 1 Set,- Water Stream For Children (Mini Watercourse In The Floor) 55.1 M, - Storm Sewage System With A Manhole Equipped With A Storm Gate Valve With 1 Set Of Controls. The Above Parameters Are General And Estimated. The Functional And Utility Program, Annex No. 1 To The Swz, Presents The Above-Mentioned Details. Scope, As Well As Technical And Organizational Solutions. The Entire Document, Together With The Annexes, Reflects The Requirements Of The Ordering Party In This Respect. However, If The Solutions, Area And Volume Indicators, Materials Or Other Important Elements Proposed By The Ordering Party Are Found By The Contractor To Be Inconsistent With Applicable Regulations Or Standards, The Contractor Is Obliged To Anticipate And Estimate This Already At The Stage Of Submitting Offers. At The Implementation Stage, The Ordering Partys Acceptance Of The Concept Or Design Documentation Does Not Release The Contractor From Liability For Design Errors Or Inconsistency Of The Design With The Existing Condition. Before Carrying Out Works In The Field, Based On The Designs, The Contractor Should Obtain Appropriate Arrangements, Agreements And Decisions.
|