The Subject Of The Order Are Construction Works Consisting In Thermal Modernization Of The Building Of Primary School No. 8 At Ul. Paderewskiego 13 In Jelenia Góra. The Above-Mentioned Primary School Is A Facility Consisting Of A Three-Story Building With A Basement And A Gymnasium Building. The Facility Is Made Using Large-Panel Technology. The Subject Of The Order Should Be Performed In Accordance With The Design Documentation Referred To In The Annexes To Volume Iii Of The Swz. Scope Of The Order: Architectural And Construction Industry. The Task Includes, Among Others: 1) Demolition And Dismantling Works, 2) Insulation Of External Walls Below Ground Level With Waterproofing, 3) Insulation Of External Walls Above Ground Level, 4) Replacement And Installation Of New Joinery Windows,5) Replacement And Installation Of External Door Joinery,6) Construction Of A Drainage Strip Around The Building,7) Plasters And Gypsum Plasters,8) Insulation Of The Flat Roof And New Covering,9) Replacement Of Gutters, Downpipes, Sheet Metal Flashings, External Window Sills,10) Bricking Up The Openings,11) Renovation Of External Stairs And Ramps,12) Renovation Of Handrails,13) Renovation Of The Roof Over The Main Building Entrance And Other Entrance Canopies,14) Installation Of Single-Pitch System Canopies,15) Reconstruction Of Chimneys And Caps,16) Replacement/Modernization Of The Central Heating Installation,17) Modernization Of The Domestic Hot Water Production Installation,18) Modernization Of Internal Lighting,19) Installation Of Photovoltaic Panels To Supply Domestic Hot Water, 20) Repair Of Walls And Plasters Damaged During Installation Works, Including Painting, 21) Accompanying And Reconstruction Works Related To Thermal Modernization. Note: The Ordering Party Informs That In Relation To The Design Documentation, There Has Been A Change In The Colors Of The Facade: 1) The Ral 8004 Color Has Been Changed To Ral 7016, 2) The Ral 1013 Color Has Been Changed To Ral 7004, 3) The Colors External Doors From Ral 3007 To Ral 7016. Industry Electrical: The Task Includes: 1) Replacement Of The Basic Lighting Installation Inside The Building, 2) Retrofitting Of The Existing Rg Main Switchgear, 3) Installation Of A Tpv Switchboard On The Roof Of The Building - Photovoltaic Installation, 4) Installation Of A Pwp Button Installation For A Photovoltaic Installation ,5) Installation Of Switchboards: Top, To1, To2, Tok, Tosg - Lighting And Power Supply Installations For Devices,6) Construction Of Internal Power Lines,7) Disassembly Of External Lighting Lamps, Cameras And Other Devices On The Facade For The Purpose Of Insulating External Walls, Then After Insulating Their Reassembly,8) Disassembly Of The Entire Existing Lightning Protection System,9) Replacement Of The Lightning Protection System,10) Installation Of Grounding And Equalizing Connections,11) Execution Photovoltaic Installation,12) Photovoltaic Panels Mounted On System Support Structures,13) Installation Of A Fi
|