1. The Subject Of The Investment Is The Implementation Of An Investment Task Called: Modernization Of The Sports Complex Moje Boisko - Orlik 2012 In Ropa, In The Following Scope: 1) Modernization Of A Multi-Purpose Sports Field In The Scope Of: A) Laying A New Polyurethane Surface, B) Installation Of Posts For Netball And Tennis, C) Replacing The Lighting With Energy-Saving Led Ones. 2) Modernization Of The Football Pitch In The Scope Of: A) Replacement Goalkeeper Nets And Ball Catchers, B) Replacing The Lighting With Energy-Saving Led Ones. 2. The Scope Of Work As Part Of The Modernization Of The Multi-Purpose Sports Field Includes In Particular: 2.1. Earthworks, A) In The Place Of The Designed Pitch, Earthworks Should Be Carried Out, Consisting Of Leveling The Area To Obtain Uniform Elevations Around The Pitch. B) Then, Within The Dimensions Of The Pitch, Redress The Soil To The Depth Of The Adopted Construction Layers Of The Pitch. C) The Level Of The Multi-Purpose Playing Field Should Be The Same As The Existing One.2.2. Drainage Of The Pitch, A) Drainage Lines Should Be Made Of Pvc Pipes Perforated Under The Pitch Surface. B) Drainage Should Be Placed In Grooves In The Filter Backfill Made Of Washed Gravel And Secured With Geotextile. C) Drain The Drainage Water Through Pvc Pipes To The Existing Storm Sewage System. D) Drainage Should Be Made Of Drainage Pipes - F113/125Mm Filters With A Filter Made Of Synthetic Fiber Or Wrapped In Geotextile. Drains Should Be Placed In Troughs Under The Base Layer And Connected To The Collective Collector Using Drainage Fittings. Plug The Drainage Ends With Sewage Caps. Collective Collector Transporting Rainwater - Existing Without Changes. In Multi-Layer Filtration Backfills, The Thickness Of Each Layer Cannot Be Less Than 10 Cm. A Ground Filter Improves The Inflow Conditions Into The Drain By Reducing The Inflow Velocity. The Material Should Be Quartz Sands And Gravels With Spherical And Smooth Grains. The Content Of Fractions Finer Than 0.02 Mm Should Not Exceed 5%, And Organic Substances - 0.5%.2.3. Modernization Of Pitch Lighting - Replacement Of Lighting Fixtures With Led Fixtures Along With Accompanying Works, A) Dismantling Of Existing Pitch Lighting Fixtures 12 Pcs. B) Delivery And Installation Of New Led Lighting Fixtures Mounted On Existing Lighting Poles 12 Pcs. (According To The Design Of The Installation Industry. Electrical) Including The Replacement Of Heads On Lighting Poles, The Replacement Of Wires Inside The Poles And Fuse Connectors And Izk In Poles, C) Performing Appropriate Electrical Measurements, D) Tidying Up The Area After The Works 2.4. Delivery And Installation Of An Information Board.3. The Scope Of Works Related To The Modernization Of The Football Pitch Includes In Particular: 3.1. Replacement Of Equipment, A) Delivery And Installation Of Nets - 2 Football Goals 2X5m Thick. 4Mm Weave, Green Color, B) Delivery And Assembly Of Nets For 2 Ball Catchers With A Set Of Fasteners (A
Contact Information
Address
Gmina Ropa,Ropa,38-312,Małopolskie,Pl218 - Nowosądecki
Contact No.
183534014
Email
przetargi@eu-ropa.p.
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91290748
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.