Expansion Of The Existing Chp System (Module 1 + 2) By 3. Module Essentially: - 1 Combined Heat And Power Plant With At Least 75 Kw Electric. As A Compact Module In A Heat And Sound-Insulating Housing On A Self-Supporting Steel Frame For Operation With Sewage Gas (And At Least 56 Kw Electric For Natural Gas) - Adaptation And Expansion Of The Sewage Gas And Natural Gas Pipes To Supply The New Chp - Integrating The New Chp Into The Heat Distribution System With Central Emergency Cooling Including Heat Meter - Moving The Existing Gas Purification Into Containers To A New Location Outdoors Including The Necessary Adjustments To The Gas And Heating Pipes - Approx. 100 M Stainless Steel Pipe Dn 32 - Dn 100 Including Insulation - Production Of Core Drilling And Fire Barriers For Pipelines And Cables - 1 Control And Monitoring Cabinet For The Module-Related Switching And Control Devices For Auxiliary Drives, Measuring Devices, Automation Devices Etc. Including User Software, Remote Diagnostic Access And Transfer Of The Data To The Higher-Level Plc As Well As Acceptance Of Commands From The Process Control System - 1 Switchgear Field As A Meter And Low-Voltage Switchgear - Approx. 250 M Of Cable And Line Installations Within Buildings Including Laying Systems - General Building Installation And Lighting - Earthing Systems, Potential Equalization And Lightning Protection - Maintenance Contract For New 3Rd Chp Plant
Contact Information
Address
Rathausstraße 19
Contact No.
+4922089466904
Email
abwasserwerk@niederkassel.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91284824
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.