Manual Piping At The Bottom Of A Trench With Exclusive Excavation Socket, Block Frame Using 6.3 Mm Ca-50 Steel - Assembly Af01/2024, Block Frame Using 8 Mm Ca-50 Steel - Assembly Af01/2024, Block Frame Using Steel 5 Mm Ca-60 - Assembly Af01/2024, Pillar Or Beam Frame Of Conventional Reinforced Concrete Structure Using 12.5 Mm Ca-50 Steel - Assembly Af06/2022, 01/16/2025, Isolated Footing Frame. Baldrame Beam And Running Shoe Using 8 Mm Ca-50 Steel - Assembly Af01/2024, Isolated Shoe Frame. Baldrame Beam And Running Shoe Using 5 Mm Ca-60 Steel - Assembly Af01/2024, Inspection/Passage Drain Box In Masonry (60X60x80cm). Mortar Coating With Waterproofing Additive. With Grid Lid. Including Excavation. Backfilling And Transportation With Removal Of Excavated Material (In Cacamba), Gutter In Galvanized Sheet Metal Esp 065Mm (Gsg-24) With Development Of 75Cm Including Vertical Manual Lifting, Loading. Maneuvering And Unloading Soil And Granular Materials In A 10 M3 Dump Truck - Loading With Wheel Loader (Bucket From 1.7 To 2.8 M3 / 128 Hp) And Free Unloading (Unit: M3) Af07/2020, Concreting Of Crowning Block Or Baldrame Beam. Fck 30 Mpa. Using A Bomb - Launch. Thickening And Finishing Af01/2024, Lean Concrete For Ballast. Traction 1:4.5:4.5 (In Dry Mass Of Cement/Medium Sand/Gravel 1) - Mechanical Preparation With Concrete Mixer 400 L Af05/2021, Circular Rainwater Conductor To The Roof In Pvc Tube. 100Mm Diameter. Including Connections And Supports, Manual Excavation Of Trench Af09/2024, Manual Excavation For Crowning Block Or Footing (Including Excavation For Placing Forms) Af01/2024, Mechanized Excavation For Baldrame Beam Or Running Footing With Mini-Excavator (Including Excavation For Placement Of Shapes) Af01/2024, Roof Truss Structure, Fink Type, With Welded Connections, Including Metal Profiles, Metal Sheets, Labor And Transport With Crane - Supply And Installation. Af01/2020Psa, Manufacturing. Assembly And Disassembly Of Formwork For Baldrame Beam. In Sawn Wood. E=25Mm. 2 Uses Af01/2024, Manufacturing. Assembly And Disassembly Of Formwork For Crowning Block. In Sawn Wood. E=25Mm. 2 Uses Af01/2024, Yellow Zebra Tape For Area Isolation Signaling. Exclusive Support For Sustainability. Including Fixing And Supply, Supply Of Structural Concrete, Pumped Machined, With Fck 25 Mpa, Including Laying, Thickening And Finishing (Foundation), Supply And Laying Of Rigid Pvc Pipe. Drainage/Stormwater. Pbv - Normal Series. Dn 150Mm (6). Including Connections, Supply And Installation Of Construction Plate With Galvanized Sheet And Wooden Structure Af03/2022Ps, Surface Cleaning With High Pressure Jet Af04/2019, Rental Of Container With Thermal Insulation, Type 3, For Construction Deposit/Tooling, With Referential Measurements Of (6) Meters Length, (2, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Internal Electrical Connections, Exclusive Mobilization/Demobilization And External Temporary Connections, Mobilization And Demobilization Of Container. Including Cargo. Unloading And Transport In Truck With Crane (Munck). Exclusive Container Rental, Mobilization And Demobilization Of Work Distant From The Urban Center With A Value Of Up To 1000000.00, Assembly Of Reinforcement Of Piles, Diameter = 10.0 Mm. Af09/2021Ps, Assembly Of Transverse Reinforcement Of Section Piles
|