Tender For Dpr And Preconstruction Activities For Rehabilitation & Up-Gradation Of Forest Stretches In Sarsa ... in India
Tender Notice
TenderID
91255480
Tender Brief
Tender For Dpr And Preconstruction Activities For Rehabilitation & Up-Gradation Of Forest Stretches In Sarsam To Kothari (Design Ch. Km 33+000 To Km 90+000) And Kothari To Dhanoda (Design Ch. Km 90+000 To Km 147+650) Of Nh 161A To 2Lps Configurations. Mah
DPR and preconstruction activities for Rehabilitation & Up-gradation of Forest stretches in Sarsam to Kothari (Design Ch. Km 33+000 to Km 90+000) and Kothari to Dhanoda (Design Ch. Km 90+000 to Km 147+650) of NH 161A to 2LPS configurations. Maharashtra.(DPR Length-14+525); 1 Key PersonnelTeam Leader cum Senior Highway Engineer 2 Senior Bridge Engineer 3 Highway cum Pavement Engineer 4 Material-cum-Geotechnical Engineer- Geologist 5 Senior Survey Engineer 6 Traffic and Safety Expert 7 Environmental Specialist 8 Quantity Surveyor/ Documentation Expert 9 Land Acquisition Expert 10 Utility Expert 11 B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)To be filled by Consultant 12 To be filled by Consultant 13 To be filled by Consultant 14 To be filled by Consultant 15 To be filled by Consultant 16 To be filled by Consultant 17 To be filled by Consultant 18 Support StaffOffice Manager 19 Typist 20 Office Boy 21 Night Watchman 22 The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of consultants 23 Duty Travel to Site (Fixed Costs) 24 Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc. 25 VI. Office Supplies, Utilities and Communication ( Fixed Costs )Office Supplies Drafting 26 Supplies computer 27 Running Costs 28 Domestic and International Communication 29 Office Furniture and Equipment ( Rental ) Office Furniture and Equipment 30 VIII.Reports and Document PrintingMonthly Report (per month) 31 Inception Report & QAP 32 Environment and Social ImpactScreening Report 33 Draft Feasibility Report 34 Final Feasibility Report 35 Strip Plan with L.A. Reports 36 Draft LA and Clearances I Report 37 Final LA and Clearances I Report 38 Draft Environmental Assessment report & RAP 39 Final Environmental Assessment report & RAP 40 Draft Detailed Design Report & Drawings etc. 41 Draft EMP 42 Draft Bidding Documents 43 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc 44 Final EMP 45 Final Bidding Documents 46 Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each) 47 LA & Clearances II Report 48 IX Survey and Investigation Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer. 49 Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology 50 B. Investigation (Fixed cost)Road and Bridge Inventory 51 FWD Test and Pavement Evaluation 52 Roughness Survey 53 Axle Load Survey 54 Material Survey and Investigation 55 Sub-grade Investigation 56 Traffic Survey 57 Socio-economic & Census Survey/ Studies 58 Land Acquisition Studies 59 Any other investigations/surveys 60 C. NET WORK SURVEY AND GPRNet work Survey of the existing Highways as a responsitory for civil work as per direction from Authority 61 GPR Survey for detection of under ground utilities 62 Cost of supply and fixing boundary pillarsProcuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) 63 Land acquisition Team including support staff and logistics/transportationEx-Land revenue inspector/officer or equivalent 64 EX-kanoogo/Girdwar or equivalent 65 Ex-Patwari or equivalent 66 typist 67 peon 68 Logistic for Land Acquisition Team Computer including necessary peripherals 69 printers 70 Vehicles(Bolero or equivalent )with monthly running limit of 4000 km 71 Estimate of Costfor Expatriate Consultants (INR) Remuneration of Exptriate staff including per diem allowancesStaff 1 72 Staff 2 73 Staff 3 74 Staff 4 75 Staff 5 76 Staff 6 77 International Airfares (Fixed Cost) Mobilization andDemobilizationPosition 1 78 Position 2 79 Position 3 80 Position 4 81 Inland Travel in Home Country (Fixed Costs)Airlines 82 Other Miscellaneous expenses (like DA, internal travel expenses other incidentals) 83 Income Tax (Expariate)( as per prevaling Norms) 84 Other Taxes / Duties (if any) Specify clearly 85 Goods & Service Tax ( as per prevaling Norms) 86 Sub Soil Investigation ( Boring) a) Boring in all type o soils ( Other than hard rock) 87 b) Boring in Hard Rock
Contact Information
Contact Person
Executive Engineer NHD Nanded
Address
EE NHD Nanded
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91255480
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.