Supply Of smps Based Ips,Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) System As Per Rdso Spec. No.Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares,Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells (Cells As Per Rdso Spec. Irs:S-88/2004 ) Along With Battery Stand.The Configuration Of Ips Should Be As Per Ncr/Hq Drawing N O. Typ/2017 /0002-10 For Ibs With Lc Gate . This Include Transportation To Consignee Depot To Site ,Installati On And Commissioning Of Integrated Power Supply System After Duly Filling Pre Commissioning Checklist Join Tly By Rdso Approved Vendor And Railway Representative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) System As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Sells (Cells As Per Rds O Spec. Irs:S-88/2004) Along With Battery Stand . The Configuration Of Ips Should Be Per Ncr/Hq Drawing N O. Typ/2017/0002-11 For Relay Hut /Lsc With Aftc, Axle Counter And Lc Gate.This Includes Transportation T O Consignee Depot, From Consignee Depot To Site, Installation And Commissioning Of Integrated Power Suppl Y System After Duly Filling Pre Commissioning Check List Jointly By Rdso Approved Vendor And Railway Repre Sentative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply And Commissioning Of Smps Based Integrated Power Supply System For Interlocked Lc Gate In Re Section As Per Rdso Specn.No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 As Per Drawing Attached (Nc.Rly. Drg. No. Typ/2017/0002-09) Of Along With Battery Set Of 1 10V/300Ah. This Include Transportation To Consignee Depot To Site ,Installation And Commissioning Of Integr Ated Power Supply System After Duly Filling Pre Commissioning Checklist Jointly By Rdso Approved Vendor A Nd Railway Representative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply Installation Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) S Ystem, As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection D Evice, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells ( Cells As Per Rds O Spec. Irs:S-88/2004 ) Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/ Hq Drawi Ng No. Typ/2017/0002-06 For Ei Station Up To 04 Lines With Block Panel And Lc Gate. This Includes Transport Ation To Consignee Depot From Consignee Depot To Site , Installation And Commissioning Of Integrated Power Supply System After Duly Filing Pre Commissioning Check List Jointly By Rdso Approved Vendor And Railway R Epresentative. [ Warranty Period: 48 Months After The Date Of Delivery ] ] , Supply, Installation Testing And Commissioning Of Smps Based Integrated Power Supply Syste M (Ips ), As Per Rdso Spec. No. Rdso/Spn/165/2023 (Ver.4.0) Amendment 1.0 Along With Surge Protection Device, Status Monitoring Panel, Spares, Tool Kit, Lmla Battery Consisting Of 55 Plus 5 Cells ( Cell As Per Rds O Spec. Irs-S-88/2004) Along With Battery Stand. The Configuration Of Ips Should Be As Per Ncr/Hq Drawin G No. Typ/2017/0002-08 For Ei Station Up To 6 Lines With Block Panel And Lc Gate. This Include Transportatio N To Consignee Depot To Site ,Installation And Commissioning Of Integrated Power Supply System After Duly Fi Lling Pre Commissioning Checklist Jointly By Rdso Approved Vendor And Railway Representative. [ Warrant Y Period: 48 Months After The Date Of Delivery ] ]
|