Building Construction Work – Completion Of A Building At The 6Th Rspbzn, Town Sofia - 1St Stage. The Subject Of The Public Procurement Includes The Completion Of A Building At The 6Th Rspbzn, Town Sofia, According To The Approved Investment Work Project Construction Of A Building Of The 6Th Rspbzn, City Sofia - Stage I By Parts As Follows: - Part Architectural; - Part Fire Safety; - Constructive Part; - Part Vertical Layout; - Road Part; - Part Landscaping; - Part Electrical Installations; - Part Fire Alarm; - Part Hvac; - Part Gas Supply; - Part Waterworks; - Part Safety And Health Plan, The Bill Of Quantities, Attached To The Documentation For Conducting This Public Procurement, Contains The Types And Quantity Of Necessary Construction And Assembly Works For The Completion Of The Site, According To The Approved Investment Project, The Completed And Accepted Construction And Assembly Works Until The Signing Of Act 10 For Ascertaining The State Of The Construction When The Construction Is Stopped (According To Ordinance No. 3 Of 31.07.2003 On Drawing Up Acts And Protocols During The Construction) And Orders Of The Construction Supervision And Authors Supervision. All Items Specified In The Bill Of Quantities Are Subject To Valuation. Technical And Economic Indicators Of The Investment Project: • Built-Up Area - 902.00 Sq.M; • Expanded Built-Up Area - 1,458.88 Sq.M; • Area Of The Land Property - 12,844.00 Sq.M.; • Area On Which The 1St Stage Is Being Implemented ~ 6200 Sq.M. The Completion Of The Building At 06 Rspbzn-Sofia - Stage I Includes The Administrative Part, Dispatch Part, Garage Cells, Educational Tower. The Buildings Are Separate Bodies, Separated By Expansion Joints, As Follows: - Administrative Part - Is A Two-Story Monolithic, Skeleton-Built Structure, Without A Basement With Dimensions Of 10.20 / 15.50 M, Height Of The Floors - 3.35 M.; - Garage Cells - Is A Monolithic, Skeleton-Built Structure, Without A Basement, Measuring 27.50 / 13.00 M, Roof Height - 6.75 M.; - Dispatch Part - Is A Two-Story Monolithic, Skeleton-Built Structure, Without A Basement, With Dimensions Of 20.95 / 13.00 M, Height Of The Floors - 3.35 M.; - Educational Tower And Auxiliary Premises - Fuel And Boiler Room - Is A Monolithic, Skeleton-Built Structure, Without A Basement, With Building Dimensions Of 12.95 / 5.00 M. • Gas And Boiler Room - On One Floor With A Roof Height Of 3.30 M, Without A Basement, With Dimensions Of 7.675 / 5.00 M. • Educational Tower With Dimensions Of 5.275M / 5.00M, On Four Floors, Height Of Each Floor Of 3.30M, With Monolithic Reinforced Concrete Staircase And Sand Cushion. - Training Track With A Length Of 50 M At This Stage, The Construction Of A Shed For Civil Defense Vehicles And Open Training Facilities Is Not Planned. At The Moment, The Rough Construction Of The Administrative Part, Garage Cells And Dispatch Part Has Been Completed. The Educational Tower Was Not Built To The Design Height. Act Model 10 Was Drawn Up For The Site To Establish The State Of Construction When Construction Is Stopped (According To Ordinance No. 3 Of 31.07.2003 On Drawing Up Acts And Protocols During Construction).
|