4.1 The Subject Of The Order Is The Maintenance Service Of Lighting Devices For Roads, Streets, Sidewalks, Parks And Sports Fields In The Wiązownica Commune, In Order To Keep Them In Proper Technical Condition. 4.2 The Scope Of The Order Covers Approximately 2,851 Luminaires And 76 Control Systems, Located In The Wiązownica Commune, Including 2,135 Pieces And 19 Control Systems Remaining On The Communes Property, And 716 Pcs And 57 Control Systems On Pges Property. Control Units.Lighting Fixtures Owned By The Commune Are Located Along Provincial, District And Municipal Roads And Public Squares In The Amount Of 1,938 Pcs., Orliki In The Amount Of 117 Pcs., In Cemeteries In The Amount Of 18 Pcs. And Sports Stadiums In The Amount Of 62 Pcs.4.3 The Scope Of Works Related To The Maintenance And Maintenance Of Lighting Includes In Particular: 1) Maintenance Of Street Lighting And Road Lighting, Lighting Of Squares, Parking Lots, Sports Fields, Sidewalks And Christmas Illuminations In The Wiązownica Commune. 2) Taking Over The Maintenance Of New Light Points (Added During The Term Of This Agreement), Installed In The Wiązownica Commune, 3) Checking The Condition Of Visible Parts Of Wires, Their Connections, Lighting Poles And Accessories (Lighting Fixtures, Lighting Sources, Closures Of Recesses In Poles, Paint Surface Of Poles, Cleanliness Of Lamp Covers, Etc.), 4) Inspection Of The Condition Of Safety, Control And Measurement Devices, 5) Inspection Of Systems Ignition Lighting Fixtures, 6) Carrying Out Measurements Of The Insulation Condition And The Effectiveness Of Anti-Shock Protection, And Removing Any Faults Found During The Process, 7) Replacing Damaged Booms, Doors And Pole Fuse Boards, 8) Adjusting The Position Of Fixtures And Reflectors As Well As Road Lighting Cable Sags, 9 ) Repair Of Switchboards, Lighting Cabinets (Replacing Locks, Bolts, Doors) And Equipment (Clocks, Fuses, Switches, Contactors, Etc.), 10) Replacement, Renovation Of Cable And Overhead Lines And Locating Their Damage, 11) Trimming Tree Branches Covering Lighting Fixtures And Absorbing The Light Flux, As Well As Bringing Them Closer To Overhead Line Wires, 12) Controlling The Switching On And Off Time Lighting, 13) Keeping All Light Fixtures On At Set Times, In Relation To The Time Of Sunrise And Sunset, 14) Checking Foundation And Restoration Of The Verticality Of Lighting Poles, 15) Painting And Maintenance Of Metal Structures Of Lanterns, Switchboards And Cabinets, As Well As Numbering Of Lighting Poles.4.4 The Ordering Party May Order Clocks To Be Set According To The Indicated Switching On/Off Time Of Individual Lighting Circuits. 4.5 The Contractor Will Be Obliged To Repair Any Damage Caused To Third Parties Related To The Execution Of The Order. 4.6 Failures Of Lighting Devices Will Be Reported To The Contractor By An Employee Of The Wiązownica Commune Office By E-Mail, Telephone Or Fax. 4.7 The Contractor Is Obliged To Remove Them Immediately, No Later Than The Tim
|