Machines And Apparatus With Individual Functions – Renewal Of Secondary Technology And Innovation Of Ris Est Moldava - Construction Implementation. The Subject Of The Order Is The Implementation Of The Work In Accordance With The Requirements Defined In The Documentation For The Selection Of The Contractor, In The Following Scope: Operating File Ps 30.1 Central Equipment: • Replacement Of Existing Switchboards Of Redundant Ris Central Offices With New Ones In Ec Moldava, Where The New Ris Will Fully Replace The Current Ris, • Rebuilding Communications To Sed Ba And Sed Za Dispatch Centers. Until The Dismantling Of The Original Ris, The Original Ris Will Still Provide Communication To Es Moldava And, In Parallel, Transmissions To The Sed Dispatch Centers, • Reconstruction Of Communication To The Remote Workplace For The Needs Of The Scada Client Of Permanent Service At Ps – Východ (Lemešany) And Communication To The Remote Workplace Of Seps Asdr Žilina , • Completion Of Fault Signaling From New Devices Installed In The Switchboards Of The Ris Central Offices, • Replacement Of The Local Pc Scada Client And System Printer, • Ps 30.1 Also Includes Delivery And Replacement Of Remote Pc Scada Clients At Asdr Service Access Workplaces And Permanent Service Ps – Východ (Lemešany), • Dismantling Of Existing Ris Central Offices - At The End Of Construction, • Adjustment Of Power Supply Awa01, Awa02. Operating File Ps 30.2 Ris - Links To Technology: • Awh11, Awh12, Awh13, Awh14, New Boxes Of Control Terminals And R33 Kv Field Protection, • Awc00, Awc01, Awc02, Awc03, Awc04, Awc07, Awc08 New Boxes Of Control Terminals Of Fields R400 Kv, • Awu401 New T401 Machine Control Terminal Switch Box. Operating File Ps 30.3 Electrical Protections (Est Moldava): • Replacement Of Ksp Protections And R 400 Kv Lines And Fault Recorders For New Ones In Protection Switchboards Ara01, Ara02, Ara03, Ara07, Ara08, • Replacement Of Existing Rop Outlet Units For New Arb01, Arb02, Arb03, Arb05, Arb06, Arb07, Arb08 (Ksp And Lines) And In Ard04 (Transformer T401), • Arb00 – Replacement Of The Existing Rop Headquarters. Operating File Ps 30.3 Electrical Protections (Est Rimavská Sobota): • Dismantling Of The Existing Distance Protection F251 Of The V427 Line In The Ara01 Switchboard, • Installation Of The New Comparative Protection F261 Of The V427 Line In The Ara01 Switchboard, • Addition Of A Gps Antenna With Accessories For Protection Time Synchronization, • Addition Of 2 Pcs. Patchcords For The Communication Of Comparative Protections. Operating File Ps 30.3 Electrical Protections (Est Veľké Kapušany): • Addition Of 2 Patchcords For The Communication Of Comparative Protections, • Tests Of The Communication Of The Comparative Protection F261 Of The V428 Line In The Ara06 Switchboard. Operating File Ps 30.5 Automatic Voltage Regulation (Arn): • Switchboard Awt401 For Voltage Regulation Of The Existing Transformer T401 – A New Switchboard With A New Voltage Regulator Will Be Installed. Operating File Ps 30.6 Tis Protections: Replacement Of Existing Tis Switches With New Ones, Modification Of Protection Communication And Other Technology To Tis. Operational File Ps 30.8 Internal Communications In Est Moldava: • Construction Of Two 24-Fiber Sm Storage Optical Cables Between The Protection House Do1 And Bsp, • Construction Of Two 24 Fiber Sm Storage Optical Cables Between The Protection House Do2 And Bsp, • Delivery Of Four Sm Optical Patch Cables For
|