Primary School Construction Work – Sep Gs Schützenstraße - Renovation And Expansion - Shell Construction Work. Shell Construction Work On The Three Existing Buildings After Previously Completed Pollution Control And Construction Of An Extension When The School Site Was Completely Empty. The Gross Volume Of The Expansion Is Approx. 8,940 M³. Type And Scope Of The Service: 1. Construction Site Equipment - Batter Boards And Measurement - Provisional Securing Of Various Openings In Different Designs - Fall Protection - Creation Of Construction Road For Crane Delivery 140 M² - Creation Of Crane Parking Space 36 M² 2. Special Civil Engineering - Support Pile Wall As Shoring 139 M² Visible Area 3. Earthworks ( Including Preparing The Outdoor Area) - Dismantling Of Various Existing Fixtures, Partial Demolition Of The Canopy On The Existing Buildings - Dismantling Of Surfaces, Asphalt, Gravel Base Layer, Manhole Covers, Etc. - Soil Excavation Of Construction Pits 1,404 M³ - Securing Embankments, Leveling Construction Pit Bottoms - Installation Of Well Rings 1.5 - 2.0 M Diameter, H = 0.5M, 98 Pieces - Disposal Of Soil Excavation Bm-0, 245 Tons - Disposal Of Soil Excavation Bm-F2, 100 Tons - Disposal Of Excavated Soil With Prior Separation Of Waste And Contaminants, 2,821 Tons - Introduction Of Open Water Drainage - Creation Of Pipe Trenches - Backfilling Of Excavation Pit 4. Ground Pipes - Installation Of Ground Pipes In Previously Created Pipe Trenches, 125 M - Installation Of Inspection Shafts Dn 400 And Dn 1000, 6 Pieces - Installation Of A Grease Separator Ns 2-4 Incl. Ancillary Services - Installation Of Sw- Pumping Station Including Accessories - Installation Of Pressure Line For Lifting System, 10 M 5. Concrete Work - Opening And Re-Sealing The Existing Base Plate For New Underground Pipes - Filling The Well Rings, C 12/15, 127 M³ - Creating Individual And Strip Foundations, 173.5 M³ - Creating A Shell For The Expansion With Reinforced Concrete Ceilings (2,738.8 M³), Supports ( 35.4 M), Beams/Beams (131.9 M), Walls (1,492 M²), Stairs Including All Necessary Additional Services (E.G. Joint Swelling Tape, Impact Sound-Insulated Support Elements, Openings) - Insertion Of Reinforcement, 117.5 Tons, And Punching Shear Reinforcement (74 Pieces) 6. Earthing Systems - Ring Earth Electrode (450 M), Potential Equalization Earth Electrode (250 M) And Connection Lugs (50 M) Install 7. Sealing And Insulation Work - Sealing The Base, 321 M² - Installing The Perimeter Insulation On The Wall And Below The Floor Slab, 965 M² - Installation Of A Studded Membrane, 314 M² 8. Masonry Work - Demolition Of Existing Masonry Walls In The Existing Building, 66 M² - Creating/Enlarging Masonry Openings In The Existing Buildings Including The Necessary Additional Services Such As Dismantling Of Existing Windows - Construction Of All Masonry Walls Of The Extension, 967 M², Including Ancillary Work (Thermal Insulation Chimney Stone, Wall Openings, Introduction Of Flat Lintels, Etc.)
|