Supply And Placement Of Work Sign Made Of Galvanized Sheet #26, Esp. 0.45Mm, Dimension (3X1.5)M, Plotted With Vinyl Adhesive, Affixed With 4.8X40mm Rivets, On 20X20mm Metal Structure, Special. 1, 25Mm, Including Autoclaved Eucalyptus Support Painted With Pva Paint Two (2) Coats, Chemical Bathroom Rental, Dimension (110X120x230) Cm, Standard Line, Containing One (1) Sink/Hand Sanitizer, Including Maintenance Immobilization/Demobilization, Container Mobilization And Demobilization, Including Loading, Unloading And Transportation In A Truck Body With Crane (Munck), Exclusive Container Rental, Rental Of Thermally Insulated Container, Type 4, For Work Canteen, With Reference Measurements Of (6) Meters Length, (2, 3) Meters Width And ( 2, 5) Meters Internal Useful Height, Including Internal Electrical Connections, Exclusive Mobilization/Demobilization And External Temporary Connections, Temporary Connections For Container Type 4 (Corresponding To Ed Code- 16351), Type 8, For De-Obras Locker Room With Eight (8) Benches And Five (5) Lockers, With Reference Measurements Of (6) Meters Length, 3) Meters Width And (2, 5) Meters Internal Useful Height, Including Internal Electrical Connections, Exclusivemobilization/Demobilization And External Temporary Connections, Temporary Connections For Type 8 Container (Corresponding To Ed Code- 16355), Mechanical Regularization Of The Right Of Way, Excavation, Loading And Transport Of 1St Category Material - Executed With Excavator 1, 40M³ And Dump Truck 12 M³ And With Service Path In Natural Bed - Dmt Of 50 To 200 M., 40M³ And Dump Truck Of 12 M³ And With Service Path In Natural Bed - Dmt Of 200 To 400 M, 40M³ And Dump Truck Of 12 M³ And With Path Service In Natural Bed - Dmt 400 A600 M, 40M³ And 12 M³ Dump Truck And With Service Path In Natural Bed - Dmt Of 800 A1,000 M, 40M³ And Dump Truck Of 12 M³ And With Service Path In Natural Bed - Dmt Of 1,800 To 2,000 M , 40M³ And Dump Truck 12 M³ And With Service Path In Natural Bed - Dmt Of 2,000 To 2,500 M, Loading And Transport Of 2Nd Category Material - Performed With 1.40M³ Excavator And 12 M³ Dump Truck And With Service Path In Natural Bed - Dmt From 1,600 To 1,800 M, Loading And Transport Of Third-Party Material Category - Executed With A 2.50M³ Loader And A 12 M³ Dump Truck And With A Service Path In A Natural Bed - Dmt Of 1,600 To 1,800 M, Regularization Of Boot-Out With Spreading And Compaction, Mechanical Compaction Of Landfill With Vibratory Roller 100% Proctornormal, Including Spreading, Regularization Of The Sub-Bed (Normal Proctor), Sub-Base, With Mixed In The Track, 33% Clay And 67% Running Spout, Compacted In The Energy Of The Intermediate Proctor (Execution, Including Supply Of The Running Spout, Excavation And Loading Of Deposit Material, Spreading, Humidification, Homogenization And Compaction Of The Mixture; Excludes Acquisition Of Soil And Transport Of Materials), Transport Of Deposit Material For Conservation. Average Transport Distance ≪= 10.00 Km (Bica Corrida And Clay), Base, 15% Clay And 85% Bica Corrida, Transport Of Deposit Material For Conservation. Average Transport Distance ≪= 10, Priming (Execution And Supply Of Bituminous Material, Exclusive Transport Of Bituminous Material), Transport Of Material Of Any Nature. Average Transport Distance ≫= 50, 10 Km, Connection Painting (Execution And Supply
|