District-Heating Mains Construction Work – K24245 Assembly Replacement At 5 Addresses. The Task Of The Winning Bidder: The Replacement Of The Shut-Off Fittings In The District Heating Pipe Shafts At 5 Locations And Their Connection To Remote Monitoring As Follows: Xiii. Kassák Lajos Utca 78. In Front Of The Shaft Marked A005931 (58-2-0280) For The Operation Of The Planned Dn600 Isolating Butterfly Valves (Provided By The Contractor), A New Dn50 Bypass Line And Its Fitting Will Be Built According To The Plans. The Ball Valves Of The Dn100 Discharge Pipes And The Dn25 Venting Fittings Next To The Disconnecting Fittings To Be Installed In The Shaft Will Also Be Replaced. Xiii. 101 Szent László Street Before In The Shaft Marked A009189 (69-2-0175) New Pipe Supports Will Be Built In The Shaft According To The Plans. A New Dn50 Bypass Line And Its Fitting Will Be Built To Operate The Planned Dn600 Isolating Ball Valves. The Ball Valves Of The Dn100 Discharge Lines Next To The Disconnector Fittings To Be Installed Are Also Replaced In The Manhole Fitting Replacement Manhole Marked 69-2-0175. Xvii. In Front Of The Gyökér Utca Heating Plant, In The Shaft Marked A007027 (71-2-0020) For The Operation Of The Planned Dn400 Disconnecting Ball Valves, A Dn50 Bypass Line And Its Fitting Will Be Built According To The Plans. The Ball Valves Of The Dn100 Discharge Lines Next To The Disconnector Fittings To Be Installed In The Shaft Will Also Be Replaced. Arc. Külső Szilágyi 16. In Front Of The Shaft Marked A004526 (78-2-0080) For The Operation Of The Planned Dn600 Disconnecting Ball Valves, A Dn50 Bypass Line And Its Fitting Will Be Built According To The Plans. In Addition To The Disconnecting Fittings To Be Installed In The Shaft, New Dn125 Discharge Lines And Ball Valves Will Be Installed In Place Of The Mud Trap. Xxi. Ii. Ferenc Rákóczi Út 200. In Front Of The Shaft Marked A003576 (39-2-5710) For The Operation Of The Planned Dn600 Disconnecting Ball Valves, A Dn50 Bypass Line And Its Fitting Will Be Built According To The Plans. In Addition To The Disconnecting Fittings To Be Installed In The Shaft, New Dn150 Discharge Lines And Ball Valves Will Be Installed In Place Of The Mud Trap. Duties Of The Winning Bidder: - After The Construction Work, The Affected Areas (Roads, Sidewalks, Green Areas) Must Be Restored To Their Original Condition, Based On The Owners Regulations. - Carrying Out The Civil Engineering (Trenching, Construction Of Structures, Structure Construction, Etc.) And Mechanical (Pipe Installation, Installation Of Fittings, Installation Of Supporting Structures, Etc.) Works Included In The Construction Plans And Related Documents, Providing All Pipe Materials, Compensators, Auxiliary Materials And Parts Necessary For Installation , As Well As Restoring The Work Area To Its Original Condition. Our Company Provides The Cover Plates Labeled Főtáv And The Disconnecting, Bypassing And Venting Assemblies. See Technical Content For Details.
Contact Information
Address
Kalotaszeg Utca 31
Contact No.
+36 203878859
Email
SallaiZ@budapestikozmuvek.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91204677
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.