1. The Subject Of The Order Is The Comprehensive Performance Of Construction And Assembly Works And Supplies Related To The Construction And Equipment Of A Childrens Club As Part Of The Task: Creation Of 24 New Care Places Under The Active Maluch 2022-2029 Program In The Municipal Maluch Club At The Following Address: Tyble 50A, 98 - 420 Sokolniki ” Implemented As Part Of The “Active Maluch” Program For The Development Of Care Institutions For Children Up To 3 Years Of Age 2022-2029 (Previous Name: Maluch+ 2022-2029, Referred To In The European Funds For Social Development Program And In The National Reconstruction And Resilience Plan). Together With: 1) Notification, In Accordance With Art. 54 Of The Construction Law, The Construction Supervision Authority On The Completion Of Construction Before Use And Obtaining A Certificate Of No Grounds For Objection, 2) Obtaining, In Accordance With Art. 55 Of The Construction Law, The Decision On The Occupancy Permit With A Finality Clause, 3) Notification, In Accordance With Art. 56 Of The Construction Law, The Authorities Of The State Sanitary Inspection And The State Fire Service (Including Covering All Related Costs), About The Completion Of The Construction Of The Building And The Intention To Use It.2. Location Of The Facility: Voivodeship: Łódź Province: Wieruszowski Commune: Sokolniki City: Tyble, Plot Number: 233/3, Precinct 0009 Tyble3. Facility Parameters: A) Volume: 2798 M3 B) Dimensions: Length Of The Front Facade + Length Of The Roof: 31.29 M + 3 M Width Of The Building + Width Of The Roof: 12.07 + 3.91 M Height Of The Edge Of The Front Facade (Attic): 3.13 Mmax. The Height Of The Designed Buildings (Ridge) 8.80 Mc) Number Of Storeys: 1.D) A Building With A Traditional Brick Structure, Placed On Direct Foundations, With A Two-Slope Roof.4. The Task Will Include The Following Installations: A) Internal Power Line, B) Rg Switchgear, C) Power Supply For Building Equipment, D) Basic And Emergency Lighting Installation, E) Power Installations, F) General Plug Socket Installations, G ) Surge Protection Installation, H) Electric Shock Protection Installation, I) Earthing And Lightning Protection Installation, J) Installation Photovoltaic,K) Telephone And Computer Installation,L) Radio And Television Antenna Installation,M) Intercom Installation,N) Cctv Monitoring Installation,O) Water Supply Installation,P) Hydrant Installation,Q) Domestic And Commercial Sanitary Sewage System,R) Ventilation Installation Mechanical,S) Air Curtains,T) Air Conditioning Installation,U) External Rainwater Drainage Installation.5. As Part Of The Development Of The Area, The Following Should Be Constructed: A) A Separate Place For Waste Collection - A Garbage Cover, B) Parking Spaces (Including One Parking Space For The Disabled), C) Fencing Of The Area, D) Hardening, E) Playground.6 . The Scope Of The Task Also Includes Comprehensive: A) Equipping The Rooms Of The Feeding Block (Kitchen), B) Equipping The Rooms.7. A Det
|