Quotation Are Invited For Replacing Of Damaged Fire Alarm Control Panel. Replacing Of Damaged Fire Alarm Control Panel With New Includingprogramming, Testing And Commissioning @ Ruwayyah Central Garage Blo Ck #I And Blockd & E And Transformer Workshop Block # C1a. Scope Of Works: -# The Contractor Is Required To Quote Lump Sum Price For Replacing Ofdamaged Fire Alarm Control Panel With New Includingprogramming, Testing And Commissioning @ Ruwayyah Central Garage Blo Ck #I (1 No.) Block D & E (1 No.) Andtransformer Workshop Block # C1 (1No.)# Corrective Maintenance Detailsbuilding Name Ruwayyah Ga Rage And Transformer Workshop (Phase # 1 & 2)Location/Floor Garage Block - I And Block - D & Etransformer Workshop Block # C1unit/Eq Uipmentdescriptionfire Alarm Systemsreplacing Of Damaged Fire Alarm Control Panel With New Includingprogramming,Testing And Commissi Oningdiagnosis/Problemidentificationfacp Damagedsolution/ Action Requirefrom Contractorreplacing Of Damaged Fire Alarm Control Panel With Newmaterial Requirement New Fire Alarmcontrol Panel With All Requiredaccessoriesquantity 3 Nos.Quality Newadditional Requireme Ntif Any1. The Parties Should Visit The Site, Check The Systems, Asses Therequirement And To Quote Lump Sumaccordingly.2. The Contra Ctor Shall Have The Approval From Dcd For The Maintenanceand Installation Of Fire Protectionsystems.3. The Systems Shall Be Maintain Ed As Per Civil Defense Regulations.4. In Case Of Unsatisfactory Performance, The Lpo Will Be Cancelledgiving 15 Days# Notice.5. Ins Tallation To Be Carried Out In The Presence Of Dewa Staff Only.6. All The Materials In General Shall Confirm As Per Latest Standards And Shall Be Submitted To Dewa Forengineers Approvals7. All The Installations Shall Be Complying With The Local Civil Defenseregulat Ions And Other Local Authoritiesif Required.8. Prior To Placing Order For Any Equipment, The Contractor Shall Submitcomprehensive Do Cumentscomprising Working Drawings, Catalogues And Descriptive Literature Ofcomponents, User#S Manuals,Maintenance Manuals Etc., For Engineer#S Study And Approval.9. The Contractor Shall Be Required To Train And Instruct Client#Spersonnel In The Correct Use, Opera Tion Andsupervision Of The System, Preferably Prior To The Handing Over Of Theproject10. The Contractor Shall Be Ensuring That All System Components Offeredshall Be Manufactured By Onemanufacturer Who Shall Also Be On The Local Civil Defense Authority#Slist Of App Roved Manufacturers Andestablished In Dubai For A Minimum Of 5 Years.11. The Contractor Shall Be Responsible For All Submittals Of C Ompletedesign Information To Dubai Civildefense Authority And For Obtaining All Necessary Approval Certificatesprior To The Commence Ment Of Theinstallation And Upon Completion If Required.12. One-Year Warranty To Be Given For All The Material Supplied By Theparty After Testing And Commissioning.13. Quotation Will Be Submitted As Per Dewa Specification And Sitesurvey. No Changes/ Variation Will Beapplicable After Releasing The Po14. The Party Should Arrange All Required Accessories, Consumables,Labour, And High-Level Access If Required.15. Any Corruption/ Damage In Existing Systems/ Structure/ Programsduring Execution Of Work Shall Becleared By The Part Y.16. If Any Programming Is Required Through Sole Agent Only.17. After Completing The Work Need To Check All Existing Programincludi Ng Cause And Effect18. Including All Required Civil Work.19. Cable 2 Core 1.5Mm Fp 200 Prysmian Only.# Contractors Should Submit Mat Erial Submittal, Method Of Statement,Risk Assessment And Action Plan To Dewa#S Supervisor Approval Beforecarryingout The Installatio N.# All Maintenance Activities Shall Be Performed In Presence/Supervisionof Contractor#S Competent Supervisor# The Contractor Shall Deploy The Skilled Technicians For Carry Out Theworks# Qty:1 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2412500077)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91187498
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.