1.1 Supply And Installation Of Workplate With Galvanized Sheet And Wooden Structure. Af_03/2022_Ps, 1.2 Mechanized Cleaning Of Plant Layer, Vegetation And Small Trees (Trunk Diameter Less Than 0.20 M), Using A Tracked Tractor. Af_03/2024, 1.3 Rental Of Container 2, 30 From *2, 40* X *6, 00* M, Simple Standard, Without Coating And Without Internal Dividers And Without Sanitation, For Use On Construction Site, 1.5 Conventional Construction Location, Using Template Of Pointed Running Boards Every 2.00M - 2 Uses. Af_03/2024, 14/01/2025, 1.6 Electricity Input, Overhead, Three-Phase, With Overhead Box, 25 Mm2 Cable And Din 50A Circuit Breaker (Concrete Post Not Included). Af_07/2020_Ps, 1.7 Temporary Water Connection, 2.1 Full Site Civil Engineer With Additional Charges, 2.2 Occupational Safety Technician (Monthly Payer), 2.3 General Foreman With Additional Charges, 3.1 Vertical Excavation For Building, With Loading, Unloading And Transportation Of 1St Category Solo, With Excavator Hydraulics (Bucket: 1.2 M³ /155 Hp), Fleet Of 3 Dump Trucks Of 14 M³, Dmt Up To 1 Km And Average Speed 14 Km/H. Af_05/2020, 4.1.1 Mechanical Leveling Of Reinforced Concrete Pile, Diameters Of Up To 40Cm. Af_05/2021, 4.1.2 Loading, Maneuvering And Unloading Soil And Granular Materials In A 6 M³ Dump Truck - Loading With Loader (Bucket From 1.7 To 2.8 M³ / 128 Hp) And Free Unloading (Unit: M3) . Af_07/2020, 4.1.3 Transport With 6 M³ Dump Truck, On Paved Urban Road, Dmt Up To 30 Km (Unit: Txkm). Af_07/2020, 4.1.4 Mechanically Excavated Pile, Without Stabilizing Fluid, 40Cm In Diameter, Concrete Cast By Concrete Mixer Truck (Excluding Mobilization And Demobilization). Af_01/2020_Pa, 4.1.5 Launching With Use Of Pump, Densification And Concrete Finishing In Structures. Af_02/2022, 4.1.6 Drilling Machine With Metal Tower For Executing Continuous Helix Pile, Maximum Depth Of 30 M, Maximum Diameter Of 800 Mm, Installed Power Of 268 Hp, Rotary Table With Maximum Torque Of 170 Knm - Daytime Chp. Af_06/2015, 4.2.1 Manual Excavation Of A Trench With A Depth Of Less Than Or Equal To 1.30 M. Af_02/2021, 4.2.2 Preparation Of The Bottom Of A Trench With A Width Of Less Than 1.5 M (Natural Soil Adjustment). Af_08/2020, 4.2.3 Manufacture, Assembly And Disassembly Of Formwork For Crowning Block, In Sawn Wood, E=25 Mm, 4 Uses. Af_01/2024, 4.2.4 Ballast With Granular Material, Application In Crowning Blocks, Thickness Of *5 Cm*. Af_01/2024, 4.2.5 Block Frame, Insulated Footing, Baldram Beam And Running Footing Using 12.5 Mm Ca-50 Steel - Assembly. Af_01/2024, 4.2.6 Concreting Of Crowning Block Or Baldrame Beam, Fck 30 Mpa, Using A Pump - Laying, Thinning And Finishing. Af_01/2024, 4.2.7 Manual Trench Backfilling, With Percussion Soil Compactor. Af_08/2023, 4.3.1 Manual Excavation Of A Trench With A Depth Of Less Than Or Equal To 1, 4.3.2 Preparation Of The Bottom Of A Trench With A Width Of Less Than 1, 4.3.3 Manufacture, Assembly And Disassembly Of Formwork For Baldrame Beam, 4.3.4 Lean Concrete For Ballast, Ratio 1:4, 5:4, 5 (In Dry Cement Mixture Medium Sand/Gravel 1) - Mechanical Preparation With Concrete Mixer 400 L. Af_05/2, 4.3.5 Block Frame, 4.3.6 Concreting Of Crowning Block Or Baldrame Beam, 4.3.7 Manual Backfilling Of Trenches, 4.3 .8 Surface Waterproofing
|