The Total Length Of The Street Under Construction Is Approximately 200 M. The Route Of The Street Is Shown In The Area Development Plan. The Construction Will Include, Among Others: Earthworks, Trenching, Foundations, Construction Of A Bitumen Main Road Surface, Construction Of New And Reconstruction Of Existing Exits, Construction Sidewalk, Construction Of A Rainwater Drainage System, Construction Of A Street Lighting Line, Construction And Reconstruction Of The Water Supply Network. The Ordering Party Has Temporary Traffic Organization For The Duration Of The Works, Which May Be Made Available To Arrangements And Implementation. The Works Include, Among Others: 1) Road Sector: A) Road With A Bituminous Mass Surface, 6.00 M Wide, B) Entrances To The Property With A Concrete Block Surface, C) Cobblestone Sidewalks Concrete With A Width Of Min. 1.8 M, D) Greenery. E) Traffic Organization, 2) Sanitary Industry - Water Supply. Construction Of Fragments Of Water Supply Connections With Plugs At The Border Of The Road Plot. 3) Sanitary Industry, Storm Sewage System: Rainwater Will Be Discharged Through The Collective Storm Sewage System And The Collected Water Will Be Discharged To The Existing Storm Sewage System, Which Ultimately Discharges Water Into The Existing Drainage Ditch.4) Industry Sanitary Sewage System: Construction Of Fragments Of Sanitary Sewage Connections To The Border Of Plots That Do Not Have Existing Infrastructure And Plugging Them At The Border Of The Plot. The Planned Sanitary Sewage System Is Expected To Be Connected To The Existing Inspection Wells, Which Should Be Replaced With New Ones.5) Telecommunications Network. The Conflicting Telecommunications Sewage System Should Be Dismantled And New Sections Of The Telecommunications Sewage System Should Be Built.6) Street Lighting: A) Construction Of A Lv-0.4Kv Lighting Network, B ) Installation Of 9.0 M High Aluminum Poles With Led Luminaires. Note: Existing Reclaimed Asphalt Is The Property Of The Ordering Party And After Its Dismantling, The Excavated Material Must Be Transported To The Place Indicated By The Ordering Party, Up To 5 Km From The Execution Of The Task.2. Carrying Out Additional Accompanying Activities: A) Restoring The Area Affected By The Investment During Its Implementation To The Condition As Before The Commencement Of The Works, B) Removal And Disposal Of Excess Soil, Rubble And Elements Not Suitable For Re-Installation, C) Cost Of Surveying Services Including The Preparation Of A Surveying Inventory Post-Construction, D) Preparatory Works (E.G. Securing The Construction Site, Setting Up Facilities And Equipment Necessary For The Implementation Of The Subject Of The Order, Protecting Existing Facilities Against Damage, Which The Contractor Performs On His Own Without Additional Remuneration. For The Purposes Of Executing The Order, The Contractor Shall Provide Its Own Energy Supply And Other Possible Utilities, E) It Is The Contractors Responsibility To Prepa
Contact Information
Address
Miasto Mława,Mława,06-500,Mazowieckie,Pl922 - Ciechanowski
Email
info@mlawa.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91164562
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.