Concrete Repair Work – Port Of Granville - Hérel Pleasure Basin - Repair Work On The Main Dike And Threshold Wall. As Part Of The Maintenance Policy For Its Maritime Ports, The Channel Department Carried Out, In 2022, A Diagnosis On The Threshold Wall And The Two Dikes (Main And Secondary) Of The Marina Of The Port Of Granville. This Revealed Numerous Disorders In These Structures: Bursting Or Cracking Of Concrete And Corrosion Of Steel. The Manche Department Therefore Wishes To Carry Out Repair Work On The Threshold Wall And The Main Dike. The Services Essentially Include General Cleaning Of Structures, Patching Or Crack Injection Work, Treatment Of Fractures And The Implementation Of A Waterproof Coating. The Duration Of The Work Is Estimated At 9 Months. The Geometric Singularity Of The Main Dike Made Up Of 52 Jarlan Caissons 14 Meters High And Stretching 360 Meters Long, Probably Requires The Installation Of Specific Tools To Meet The Constraints Of This Site. Notification Of The Contract Is Envisaged At The End Of March 2025, With The Start Of The Preparation Period In May Then Execution Of The Work From September 2025. The Amount Of The Operation Is Estimated At 7.8 M Euro(S) Including Tax. Estimated Duration Of The Work (Excluding The Preparation Period): 9 Months Estimated Start Of Services: - The Preparation Period: May 2025 - The Work: September 2025
Contact Information
Address
98 Route de Candol
Contact No.
0233055550
Email
correspondre@aws-france.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91154706
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.