Tender For W/S of Nizamapur Arand marg(Ch.-10.000 to 15.200) (5year Maintenance Work) - Scarifying the existing bituminous surfaceto a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres. (including all taxes, labour cess etc but excluding GST.) 2 Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including all taxes, labour cess etc but excluding GST.) 3 Construction of Embankment with Material Deposited from Roadway Cutting:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (including all taxes, labour cess etc but excluding GST.) 4 Construction of Embankmentwith Material obtained from Right of way:- Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2. (including all taxes, labour cess etc but excluding GST.) 5 Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (including all taxes, labour cess etc but excluding GST.) 6 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including all taxes, labour cess etc but excluding GST.) 7 Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 8 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 9 Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 10 Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including cost of material,Labour cess etc but Excluding Bitumen & GST.) 11 Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (including all taxes, labour cess etc but excluding GST.) 12 Plain cement concrete M15 in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundationand compacted by vibration including curing for 14 days foundation. (including all taxes, labour cess etc but excluding GST.) 13 RCC Grade M20 using batching plant transit mixer & manual placing (including all taxes, labour cess etc but excluding GST.) 14 Supplying, fitting and placing HYSD bar reinforcement in super structure complete as per drawing and technical specifications as per SI No-504 (including all taxes, labour cess etc but excluding GST.) 15 PART BMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly. 16 1st year- maintainance cost 0%on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 17 2nd year- maintainance cost 0.25% on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 18 3rd year- maintainance cost 0.50 %on Bituminous, CC & drain Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 19 4th year- maintainance cost 0.75% on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 20 5th year- maintainance cost 1.00 % on Bituminous, CC & drain Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
|