Providing Supplying Spares And Rectification Works At Umala Water Treatment Plant For Year 2024 25- 1 Valves of Filter Beds1) 500 mm dia Valves of Raw water channel, Drain of beds, Bed wash, Over head wash water tank.a) Labour work for repair of valve, over oiling etc as required. 2 b) Reconditioning of Gear Box 3 c) Supply of Copper Bush, Bearing, gland packing, O ring etc. 4 d) Work shop lath machine, welding etc work 5 2) 200 mm dia Valves of Air pressure, Blower.a) Labour work for repair of valve, over oiling etc as required. 6 b) Reconditioning of Gear Box 7 c) Supply of Copper Bush, Bearing, gland packing, O ring etc. 8 d) Work shop lath machine, welding etc work 9 3) 1200 mm dia Valve of MBRa) Labour charges for opening and fitting for gear box, valve cap etc. 10 b) Supply of Gears, bush bearing, workshop work etc complete required for Gear Box. 11 c) Supply of Spindle as per sample of valve 12 d) Supply of Check nut of Gun Metal as per sample 13 e) Supply of Nut bolt, rubber sheet 14 Actuator of Filter Bed, Inlet, Drain, Wash Water, Blower, Pure water, OH storage tank, Bed wash water, Blower, OH filling Pumps.a) Labour charges for open, close overall for actuator. 15 b) Work for Gear and related items. 16 c) Work for electric motor repair. 17 Pumps of Recirculation sump, over head tank1) Submersible Mud Pump set (20 HP)a) Labour for removing opening and fitting works 18 b) Workshop work 19 c) Supply of Bearings 20 d) Winding and warnishing to motor 21 e) Supply of Impeller 22 2) Centrifugal Pump set for Recirculation dewatering (15 HP)a) Labour for removing opening and fitting works 23 b) Workshop work 24 c) Supply of Bearings 25 d) Winding and warnishing to motor 26 e) Supply of Impeller 27 3) Centrifugal Pump set/ Clorination Plant (7.5 HP)a) Labour for removing opening and fitting works 28 b) Workshop work 29 c) Supply of Bearings 30 d) Winding and warnishing to motor 31 e) Supply of Impeller 32 Flash mixer on Raw water channel. 1) Motor for Gear Box (10 HP) 33 a) Labour for removing opening and fitting works 34 b) Workshop work 35 c) Supply of Bearings 36 d) Winding and warnishing to motor 37 e) Supply of Impeller 38 2) Gear Box 39 3) Sturrer, Flash mixing arragement 40 Clorifloculator no 1 & 21) Central bearing with cup 41 2) Rollers of bridgea) work shop work of filling material by welding and machining 42 b) Supply of Bearings 43 c) Labour work for open, overall etc. 44 3) End carriage bridge circulation motor (5 HP) 45 4) End carriage Gear Box of Bridge. 46 5) Gear Box of CLF & Floculator Bridge 47 6) Motor of CLF & Floculator Bridge 48 7) Sleepring unit of CLF Bridge 49 8) Wash out Valve 300 mm dia 50 Liquid Alumn dewatering ( 2 HP) 51 Alumn & TCL Liquid Pump (1.5HP) 52 Supply of helper for Lifting of Alumn, clorine cylinder, operation of MBR, cleaning the site.1) Mechanic 53 2) Helper 54 Epoxi painting to corrosed portion of MS Pipes 55 Sub station 33 Kv/ 440 Volt at water treatement plant1) Supply of spares and repairs existing A.B. Switches 56 2) Reconditioning of earting pits for improvement of earth resistance/ value 57 3) 33 KV DO set with barrel Fuses, including replacement ofmale female copper contacts. 58 4) 33 KVLA unit with required Hardwares 59 5) Supply and fixing of 33 KVPost Insulators. 60 6) Supply of oil for Transformer top up. 61 7) Oil Filtration by filtration M/C only including BDV, PPM, test Thoroughly cleaning of complete TransformerChecking HV & LV connections & earthing tightness, HV & LV side bushings, Cleaning etc. 62 Supply of Material Flange Joint with Nut bolts, Rubber sheet etc.a) 500 mm dia 63 b) 300 mm dia 64 c) 200 mm dia 65 d) 150 mm dia 66 Reapir of starter including cost of relay and fuses. 67 Supply of 3 core x 4 sq mm aluminium cable 68 Supply of 3 core x 4 sq mm copper waterproof cable 69 Supply of 63 Amp Fuse 70 Providing and fixing lugging to cables 71 Supply of O-Tolidine for laboratory 72 Supply of Universal Indicator for Laboratory 73 Supply of Gear Oil. 74 Supply of Bearing Grease.
|