General Construction Work For Pipelines – Szeged Industrial Area Phase Ii (Advanced Installation). In Order To Implement The Project, Present Ii. In Terms Of Phase (Advanced Facilities), The Tasks Of The Winning Tenderer Are As Follows: Northern Belt Canal; 2,785 M Long (Between Sections 0+008-2+793) Canal Covered With High-Conductivity Tb 350/423/90 Prefabricated Elements. Fehértó Cooling Pool; Raised, Film-Covered Water Reservoir, 1 Inlet And 1 Outlet With Reinforced Concrete Artificial Object, The Damping Pool Has A Volume Of 8320 M3. Öthalmi Cooling Pool; Raised, Film-Covered Water Reservoir, With 2 Draining Reinforced Concrete Man-Made Objects And A Filling Line Connection, Which Is Part Of The Eastern Pressure Line. The Cooling Pool Has A Volume Of 11,332 M3. Reception Points; Construction Of 6 Artefacts, 1. Reception Point: Construction Of A Rainwater Lifting Pump 2. Reception Point: Construction Of A Rainwater Lifting Pump 3. Reception Point: Construction Of A Reinforced Concrete Structure 4. Reception Point: Construction Of A Rainwater Lifting Pump 5. Reception Point: Construction Of A Reinforced Concrete Retaining Wall 6. Reception Point: Reinforced Concrete Building Construction Of 7. Reception Point: Construction Of Pressure Pipeline, With Highway Crossing. Conversion Of The Öthamli Pumping Station; Reconstruction Of The Fittings Of The Existing Pumping Station, For The Connection Of Section I Of The Eastern Pressure Pipeline. Section I Of The Eastern Pressure Pipeline; The Pipeline Designed To Fill The Öthalmi Damping Pool. Section I Of The Eastern Pressure Pipe Is 60 M Long, Made Of Dn900 Üpe, And The Branch Filling Line Is Made Of 21 M Long Dn 900 Üpe Pipe. By Creating Manholes (1 Water Meter And 1 Fitting Manhole) In Several Places On The Pipeline. Temporary Drainage; - Temporary Draining Of The Öthalmi Canal, With Conversion Of Mobile Pumping Station No. 1. - Temporary Connection Of The Northern Belt Canal To The Öthalmi I M. Temporary Demolition; The Ii. Track, Which Is 2X 625 M Long And I/2 Track, Which Is 2X 340 M Long, Will Be Dismantled, The Pipelines And Construction Materials, Pumps Will Be Transported To The Site Designated By Ativizig. Planning; - Finalization Of Revision And Modification Of Tender Plans At The Export Level - Compilation Of Implementation Plan, Operating License Documentation, Operating Regulations - Licensing And Planning Of The Mining Site The Main Quantities Are The Following: - Earthworks: • Landfill Construction: 67,440 M3 • Excavation Of Soil From The Mining Site: 53,200 M3 - Prefabricated Tb350 Item /423/90: 1382 Pieces - Length Of Paved Section 2+793-0+008=2785 M - Length Of Art Object 0+116 10.13 M - Length Of Art Object 2+076 12 M - Length Of Paving Element Tb350/423/90 2785-10.13-12= 2,762.87 M 1,382 Pcs - Cooling Pool Foil Covering: 21,100 M2 - Works Of Art: • Pump Station Construction: 2 Units • Pump Station Reconstruction: 1 Unit • Reinforced Concrete Structure Construction: 8 Units Revision As Necessary, And The Fulfillment Of All Design Tasks Are Customer Requirements That Are Part Of The Technical Content (3. Volume) According To Its Regulations. Ak Draws Attention To The Fact That
Contact Information
Address
Márvány Utca 1/d
Contact No.
+36 12254400
Email
csonka.gergo@ovf.hu
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91112492
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.