Expansion And Reconstruction Of The Existing Water Treatment Plant In Brzostek Together With The Necessary Facilities And Technical Infrastructure Devices On Plots No.: 695/2, 695/5, 695/13, 696/2 Within The Brzostek Register. The Task Will Include: - A New Single-Story Brick Technological Building With An Area Of Usable Area: 165.7 M2 (Including Filter Hall Area: 133.7 M2) In Traditional Technology With A Sloping Roof, - Reaction Chamber With A Capacity Of Approx. 200 M3 With An Intermediate Pumping Station - An Above-Ground Facility, Partially Submerged, Designed As A Rectangular, Two-Chamber Monolithic Reinforced Concrete Tank With An Attached Intermediate Pumping Station, - Two Reinforced Concrete Monolithic Cylindrical Vertical Tanks For Treated Water With A Capacity Of Approx. 200 M3 Each With Equipment, - Technical Infrastructure: Inter-Facility Pipelines With A Diameter Of 100 - 225 Mm, Water Drain Of The Designed Tank Into The Existing Sewage System, Manholes, Lighting And Other Necessary Devices, - Development Of The Investment Area (Pedestrian And Road Communication Devices, Greenery , Fence), - Off-Grid Pv Installation With A Capacity Of 48.0 Kwp With Energy Storage Located On The Ground In In The Vicinity Of The Station On Plot No. 1489 Belonging To The Commune, Within The Brzostek Register; The Electricity Produced By The Installation Will Be Used Locally For The Needs Of Technological Processes Carried Out In The Suw. The Target Capacity Of The Suw Will Be 1,000 M3 Per Day. The Investment Is Located In An Area Under Conservation Protection Based On An Entry In The Register Of Monuments Of The Podkarpackie Voivodeship, Registration Number A-150 Of March 11 .1978 (“Brzostek – A Town Within The Current Borders Administrative). Due To The Above, The Appropriate Conservation Permit Was Obtained, Ref. No. Rz-Irn.5152.91.2022.Sm Of March 11, 2022. Based On The Prepared Documentation, The Applicant Obtained The Final Decision On The Building Permit No. 539/2022, No. Ab, For The Entire Scope Of The Task. 6740.15/42/2022 Of August 19, 2022, Issued By The Starosta Of Dębicki. The Method Of Implementation And The Main Parameters Of The Task Are Described In Detail In The Technical Documentation: A) In The Scope Of Construction Works Requiring A Building Permit - In The Architectural And Construction Design (Pab) And The Land Development Design (Pzt): - Subject Of The Project: Pab, P. 6; Pzt, P. 5, - Current And Planned Development Of The Investment Area: Pzt, Pp. 5-7, - Characteristic Parameters Of The Building (Volume, Surface Area, Height, Length, Width, Diameter, Number Of Storeys): Pab, P. 9 ,- Construction Technology, Installations: Pab, Pp. 6-7.B) In The Scope Of Pv Installations For Suw - In The Installation Design: Installation Location, Installation Power, Number And Area Modules, Estimated Annual Energy Yield: P. 3. In Relation To The Pv Installation, Taking Into Account Its Designed Power, In Accordance With Art. 29 Section 4 Point
|