1) The Subject Of The Order Is The Modernization Of Staircases And The Corridor On The Ground Floor Of The Municipal Office Building Located On Plot No. 1330/1, Commune. Żabno. 2) The Scope Of The Order Includes: A) Preparatory Works - Removal Of Equipment, Protection Of Floors And Windows With Protective Foil, Dismantling Of Old Lighting Fixtures. B) Construction Works - Removal Of Old Plasters, Preparation Of Wall Surfaces For Painting By Priming, Filling And Applying Gypsum Plaster . Construction Of Suspended Ceilings And Floors Made Of Stoneware And Granite Tiles.C) Installation Works - Disassembly Of Old Electrical Installations And Installation Of New Led Fixtures With Appropriate Lighting Parameters.D) Renovation Of The Main Stairs - Disassembly Of Stoneware Tiles And Metal Balustrades And Construction Of Granite Stairs With Plinths And Chrome Balustrade. E) Renovation Of Corridors Marked In The Graphic Documentation With Numbers: 0.02, 0.03 And 0.12 – Scraping Mosaic Paneling, Priming, Plastering, Painting Walls; Construction Of A Suspended Ceiling; Building A Hydrant On The Ground Floor; Making The Paneling With Colorless Varnish; Replacement Of Lighting With Led Ceiling Lamps; Assembly Including Installation Of An Air Curtain Over The Entrance Door; Replacement Of The Feeding Window So That The Window Is Open At Its Entire Height - Not Divided In Half, But With The Ability To Stop In A Selected Position; Installation Of An Aluminum Roller Blind In The Color Of The Window - Steel Graphite In The Facade Windowf) Renovation Of Stairs - Descent To The Basement - Disassembly Of Stoneware Tiles, Installation Of A New Floor Made Of Stoneware Tiles With Plinths And A Chrome Balustrade.G) Finishing Works - Painting Walls, Ceilings And Making Wainscoting Made Of Clear Varnish. Installation Of Plinths And Chrome Balustrades.H) Cleaning Works - Cleaning After Completion Of Work, Washing Windows, Doors And Woodwork, As Well As Cleaning Granite And Pvc Surfaces.3) In Addition, A Detailed Description And Scope Of The Subject Of The Order Are Specified In: Bill Of Quantities - Annex No. 4 To Swz Graphic Documentation – Annex No. 5 To The Swz, Stwiorb – Annex No. 6 To The Swz, Draft Contract Provisions - Annex No. 7 To Swz4) The Draft Contract Provisions Adopt The Principle Of Lump Sum Remuneration, So The Bill Of Quantities Included In The Order Documentation Is Also Intended To Enable The Valuation Of Individual Elements Of The Works.5) The Ordering Party Expects The Contractor To Provide The Price For The Execution Of The Order , Divided Into The Price For The Implementation Of Each Task, As A Lump Sum Price, Which Includes The Execution Of All Elements Of The Contract That Are The Subject Of The Drawing And Text Of The Procurement Documents, Including Vat Applicable In The Date Of Submission Of The Offer. 6) Before Signing The Contract With The Selected Contractor, The Ordering Party Requests That The Contractor Present A Simplified Offer Co
Contact Information
Address
Gmina Żabno,Żabno,33-240,Małopolskie,Pl217 - Tarnowski
Email
dzp@zabno.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91103113
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.