1. The Subject Of The Order Are Construction Works Consisting In The Reconstruction Of The Municipal Road Ul. Stalowa In Zakrętym, As Part Of The Task: Reconstruction And Modernization Of Streets In The City Of Zakrętym. 2. The Detailed Method Of Execution As Well As The Scope And Type Of Individual Works Covering The Subject Of The Order Were Specified In The Bill Of Quantities Constituting Annex No. 4 To The Swz And In The Technical Specification For The Execution And Acceptance Of Works, Constituting Annex No. 3 To The Swz.3. The Execution Of The Order Is Subject To Polish Law, In Particular The Act Of July 7, 1994, Construction Law (Journal Of Laws Of 2024, Item 725, As Amended) And The Act Of September 11, 2019, Public Procurement Law (Journal Of Laws Of 2024, Item 725, As Amended). . Of 2024, Item 1320).4. The Scope Of Works Includes: 1) Measurement Works For Linear Earthworks, 2) Dismantling Of The Surface Of 15 Cm Thick Concrete Road Slabs (Trylinki) With Filling Of The Joints With Cement Mortar, 3) Mechanical Dismantling Of The Surface Of 6 Cm Thick Mineral-Bituminous Mixtures, 4) Mechanical Dismantling Of Various Types Of Bases With An Average Thickness Of ~10-15 Cm, 5) Dismantling Of 15X30 Concrete Curbs Cm On A Cement-Sand Ballast, 6) Dismantling Concrete Footings For Curbs, 7) Crushing Concrete Elements From Demolition Into Crushed Aggregate Into The Lower Layers Of The Foundation. ~5% Loss In Material Quantity Is Assumed. The Price Includes Transport From The Construction Site Where Crushing Will Be Carried Out, 8) Removal Of Rubble From The Demolition Site By Mechanical Loading And Unloading With A Self-Unloading Vehicle Over A Distance Of 10 Km, 9) Mechanical Clearing Of Sparse Bushes And Undergrowth, 10) Construction Of An Auxiliary Base Made Of Cement-Stabilized Aggregate ( From A Concrete Plant) C 1.5/2 Gr. Layers After Compaction 15 Cm, 11) Construction Of A Base Made Of Crushed Natural Aggregate With A Thickness Of 15 Cm, 12) Base Made Of Mineral-Bituminous Mixture - Main Base Made Of Ac 22 P Pmb 25/55-60 For Kr 3, 7 Cm Thick, 13) Sprinkling The Road Surface With Asphalt Emulsion, 14) Surface Made Of Mineral-Bituminous Grit Mixtures - Layer Binding With Ac 16 W Pmb 25/55-60 For Kr 3 Thickness 5 Cm,15) Surface Made Of Mineral-Bituminous Grit Mixtures - Wearing Course With Ac 11 S Pmb 45 / 80-55 For Kr 3, 4 Cm Thick,16) Surfaces Made Of Holland-Type Concrete Paving Stones, 8 Cm Thick, Gray In Color On A Cement Ballast -Sand (Including Road Sewage From Holland Cubes 0.6 M Wide),17) Horizontal Pavement Marking Bituminous - Cold, Using Chemically Hardened Masses, Thick Layers Made Mechanically - Structural Marking (Super Plastomarker).5. The Contractor Should Mark And Secure The Work Area In Accordance With The Temporary Traffic Organization Design.6. Reconstruction Of The Municipal Road No. 888004 In Zakrzywym At Ul. Stalowa Is Located On Plot No. 31, District 0019 (02-10) And Plot No. 9/2, District 0020 (02-11) Zakrzyczym, In Th
|