Lot 1 - Architectural Project, Lot 1 - 3D Images, Lot 1 - Estimated Budget, Lot 1 - Executive Architectural Project, Lot 1 - Landscape Architecture Project, Lot 1 - Architectural Renovation Project, Lot 1 - Project For Approval By Health Surveillance (Municipal Or State), Lot 1 - Legal Project (For Municipalities That Have Specific Regulations For Issuance Of Construction Permit/Project Approval), Lot 1 - Accessibility Adequacy Project, Lot 1 - Furniture Project, Lot 1 - Interior Renovation Project, Lot 1 - Lighting Project, Lot 1 - Conditioning Project Acoustic, Lot 1 - Project Compatibility Analysis, Lot 1 - Structural Project In Reinforced Concrete, Lot 1 - Metal Structural Project, Lot 1 - Wooden Structural Project, Lot 1 - Structural Project Of Mixed Structures, Lot 1 - Pile Foundation Project, Lot 1 - Shoe Foundation Project, Lot 1 - Project Of Foundations Soluções Mistas, Lot 1 - Boundary Containment Project, Lot 1 - Structural Reinforcement Project, Lot 1 - Retaining Wall Project, Lot 1 - Electricity Project, Lot 1 - Spda Project - Atmospheric Discharge Protection System, Lot 1 - Energy Entry Project For Approval At Celesc, Lot 1 - Substation Project Up To 300Kva , Lot 1 - Substation Project Above 300Kva, Lot 1 - Communication And Logic Project, Lot 1 - Air Conditioning Project, Lot 1 - Air Renewal Project, Lot 1 - Medicinal Gases Project, Lot 1 - Hydraulic Installations Project (Cold Water), Lot 1 - Hydraulic Installations Project (Hot Water, Lot 1 - Hydraulic Installations Project Sanitary Sewerage, Lot 1 - Building Stormwater Project, Lot 1 - Drainage Project, Lot 1 - Fire Prevention Project (Ppci) Up To 80M², Lot 1 - Fire Prevention Project (Ppci) From 81 To 750M², Lot 1 - Fire Prevention Project (Ppci) Above 750M², Lot 1 - General Cost Budget Spreadsheet Of The Work And Physical Financial Schedule (Bdi E Calculation Memory), Lot 1 - Update Of The Budget Spreadsheet Of The General Cost Of The Work And Physical Financial Schedule (Bdi And Calculation Memory), Lot 2 - Restoration Project (Historical And Cultural Heritage), Lot 2 - Monuments Project, Lot 2 - Budget Spreadsheet Of The General Cost Of The Work And Physical Financial Schedule (Bdi And Calculation Memory), Lot 2 - Update Of The Budget Spreadsheet Of The General Cost Of The Work And Physical Financial Schedule (Bdi And Calculation Memory), Lot 3 - Technical Building Assessment Reports
|