Tender For Library Room Construction Work In Pipalheda Village - Excavation of soil upto 1.5 depth in foundation, trench, drain, tamping the bottom, pouring water, beautifying the sides, taking out the excavated soil, filling the empty spaces with soil again after filling the foundation and disposal of the remaining soil upto a distance of 50 meters. 2 In cement concrete foundation or floor, put 40 mm nominal size stone aggregate (crusher broken)/brick soil in cement-sand mixture in the ratio of 1 cement : 4 sand : 8 aggregate and tamping, including tamping. 3 Laying of stone in foundation and plinth in cement-gravel mixture, including closing the side gap and tamping etc. 4 Centering/Shuttering (Platform and Casting) for laying RCC roof, slab, balcony, lintel etc. upto 4.5 m height and removal etc. as per specifications. 5 Supply and casting of reinforced cement concrete of cement concrete 1:2:4/1:1.5:3 mix, pressing, tamping and levelling of surface with 1:3 cement mortar etc. in roof slab, balcony, beam, lintel etc. including scaffolding but cost of steel and shuttering separately. 6 Cutting, bending and fixing of iron for RCC work and fastening work including supply. 7 Foundation and plinth first class brick masonry in cement-gravel 1:6 or 1:8 mortar including closing of side cracks and tamping. 8 Cement Supply and casting of reinforced cement concrete of 1:2:4/1:1.5:3 mix, pressing, plastering and leveling of surface with 1:3 cement mortar etc. in roof slabs, balcony, beams, lintels etc. including scaffolding but cost of steel and shuttering separately. 9 Iron work in grills/gates etc. including cutting, mounting and fixing of flat cones, T and channel etc. 10 Supply and fixing of double pane window of 22 gauge plain sheet in 25X25X3 mm frame of angle iron along with 10 mm grill, 3 mm glass and fitting of argal sliding bolts, latches and catch strips etc. 11 22 gauge plain GI Window made of sheet in which the entire door frame is of 25 X 25 X 3 mm iron cone, 10 mm grill with armel, 2 latches and 4 strips are to be supplied. 12 steel door and window 13 Fitting and supplying 14 mesh, 24 gauge iron mesh in iron window and fixing it with 20 X 3 mm beading and tightening it with screws. Analysis for 0.72 square meter for a window of size 1.2 X 0.60 meter 14 Cement plaster on the wall by mixing cement-gravel in 1:6 ratio, scraping the joints and regular watering for 14 days. 15 celing palster 16 In earth work, digging a pit on the side of the road and lifting the earth 1.5 m and taking it upto 50 m, breaking the lumps and laying it in 25 cm layers and pressing and leveling and making camber. with taraasanpot 17 Supply of 15 cm high stones for dry trench under the floor and complete work of laying trench. 18 Polished Kota stone flooring over 1:4 cement gravel mixture of 20 mm thickness, laying and grinding of skirting (minimum 3 times) and joining the joints by filling them with cement slurry etc. 19 Laying of 40 mm concrete in cement concrete foundation or floor. Stone aggregate of nominal size (crusher broken) / brick aggregate, cement-sand mixture, mixing in the ratio of 1 cement: 5 sand: 10 soil and ramming, including tamping. 20 ditemersing 21 Applying enamel paint in 3 layers to give even shade. Making even surface on new work / old work. 22 Contigencies 2%
|