A. Basic Scope (Guaranteed) Includes: I. Construction Works: 1) Replacement Of Joinery And Joinery (Including Replacement Of The Smoke Flap). 2) Construction Works 3) Partition Walls 4) Floors 5) Plasters And Cladding 6) Painting Works 7) Replacement Of Roof Covering With Lightning Protection Installation 8) Construction Of A Fire Protection Road For Turning 9 ) Installation Of An Information Board. The Construction And Installation Of An Information Board Should Be Taken Into Account. The Board Should Be Placed In A Place Visible To The Public. It Should Be Placed Immediately After The Physical Implementation Of The Task Begins. The Board Must Have Dimensions Of Not Less Than 120X60 Cmii. Electrical Works: 1) Electricity Measurement System 2) Switchboards 3) Internal Power Lines 4) Lighting And Plug Socket Installations 5) Fire Protection Installation, Equalizing Connections 6) Lightning Protection Installation 7) Power Supply Installation For Power Devices 8) Lan Installation 9) Sswin Installations 10) Intercom Installation 11) Staircase Smoke Extraction Installationiii. Sanitary Works: 1) Water Supply Installation 2) Sanitary Sewage System 3) Heating Installation 4) Mechanical Ventilation Installation 5) Air Conditioning Installation B. Scope Of The Option Law:1) The Scope Of The Optional Order Includes: A) External Elevator B) Construction Of A Shaft C) Delivery, Assembly, Preparation Of Technical Documentation, Commissioning And Acceptance Of An External Passenger Elevator In Accordance With The Documentation (Passenger Lift Adapted To The Needs Of Disabled People With A Nominal Load Capacity Of 8 People/ 630 Kg. Type Of Drive - Screw Located In The Shaft, Number Of Stops - 2, Number Of Door Openings In The Shaft - 2, Lifting Height - 3250 Mm.)D) Renovation Of The Ramp For The Disabled2) The Ordering Party Reserves The Right To Increase The Basic Order By The Scope Covered By The Option Right. The Ordering Party May Exercise The Option Right If It Has Financial Resources. 3) The Ordering Party Will Notify The Contractor In Writing About The Exercise Of The Option Right Within 60 Days From The Date Of Signing The Contract. 4) All Provisions Of The Agreement Regarding The Implementation Of The Basic Order Shall Apply Mutatis Mutandis To Orders Executed Under The Option. 5) If The Ordering Party Does Not Use The Option Right, The Contractor No Claims Are Due In This Respect.6) Method Of Settlement: As For The Basic Order.7) The Deadline For Completing The Order Covered By The Option Right Is Counted From The Date Of Re-Handover Of The Construction Site And Is 90 Days. C. The Execution Of The Task Additionally Includes: 1) Preparation Of As-Built Documentation; 2) Comprehensive Geodetic Services Including As-Built Geodetic Inventory In 4 Sets. (Including 2 Sets On An Electronic Medium) And Changes In The Records, Including The Division And Allocation Of Land For Facilities. Format And Content Of Files Containing As-Built Measurements In Vector F
Contact Information
Address
Gmina Kędzierzyn-Koźle - Urząd Miasta,Kędzierzyn-Koźle,47-220,Opolskie,Pl524 - Opolski
Email
zp@kedzierzynkozle.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91016616
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.