1. The Subject Of The Order Are Construction Works - A Short Description Of The Subject Of The Order: Reconstruction Of A District Road, Construction Of A Sidewalk In The Town Of Kamień, Construction Of A Sidewalk On A Section Of 605.00 M, Clearing Bushes Of 600.00 M2, Demolition Of Surfaces Made Of Ba Gr. 8Cm 91.00 M2, Demolition Of The Aggregate Foundation Thickness. 15Cm. 91.00 M2, Demolition Of Exits Made Of Aggregate Thickness. 15Cm 86.00 M2, Demolition Of Edges M 76.00, Demolition Of Culverts Dia. 40 Cm Under The Exits 15.00 M, Demolition Of Steel Barriers 122.00 M, Disassembly Of Posts And Vertical Sign Shields 4/6 Pcs., Construction Of A Deep Trough. 20 Cm In Total 1004.00 M2, Construction Of A 35 Cm Deep Bed 44.00 M2, Construction Of An Embankment Made Of Embankment Soil 183.00 M3, Construction Of Sewage Channels From Pvc Pipes With A Diameter Of 160Mm 9.00M, Arrangement Of Drainage Curbs 3.00 Pcs., Sand Drainage Layer Thick. 10Cm 1048.00M2, Substructure Made Of Crushed Aggregate 0/31.5Mm Thick. 10Cm 918.00M2, Thickness 15Cm 130.00M2, Thickness 25Cm 91.00M2, Bituminous Works, Ac 11S Grit. 4Cm 91.00 M2, Bituminous Works, Binder Ac16w, Thickness 6Cm 91.00 M2, Strengthening The Slope With Openwork Slabs 3.00 M2, Construction Of Culverts Under Pipe Exits With A Diameter Of 40Cm 14.00M, Installation Of Collar Ends On Culverts 4.00 Pcs., Construction Of Roadsides From Aggregate Thickness. 10Cm 27.00M2, Cleaning Roadside Ditches 340.00M, Setting Up Road Barriers 138.00M, Making Thick-Layer Horizontal Markings 29.00M2, Setting Up Sign Posts 7.00Pcs, Installing Sign Boards 8.00Pcs, Setting Up A Curb 15X30cm On A Concrete Bench. C12/15 With A Resistance Of 606.00 M, Construction Of A Sidewalk Made Of Concrete Paving Stones, Thickness. 6Cm, Gray Color On Cement-Sand Ballast. Gr. 3Cm 918.00M2, Placing Concrete Edges 30X8cm On Cement-Sand Bedding. Gr. 5Cm 637.00M, Making Slopes From Paving Stones 130.00M2
|