1. The Subject Of The Order Is The Construction Of A New Pszok As Part Of The Lamusowania2.0.2 Project. The Scope Of The Order Includes The Following Works: 1) Construction Of Storage Boxes No. 1. Scope Of Construction Works: Earthworks, Retaining Wall, Insulation, Steel Structure, Roof Cladding, Floors, Electrical Installations2) Construction Of Storage Boxes No. 2. Scope Of Construction Works: Earthworks, Retaining Wall, Insulation, Steel Structure, Roof Cladding, Floors, Electrical Installations3) Reconstruction, Extension, Building Superstructure Garage For A Garage And Inspection Building. Scope Of Works: A) Construction Works: Demolition, Earthworks For Foundations, Insulation Of Foundation Walls, Masonry, Reinforced Concrete, Steel Structures, Gutters, Downpipes, Sheet Metal Work, Window And Door Joinery, Joinery, Plastering, Cladding, Painting, Floors And Floors With Insulating Layers, Façade Insulation, Drainage Strip, Works Locksmith And Blacksmith; B) Sanitary Industry: Water Connection, Sanitary Sewage Connection, Water Supply Installation, Sanitary Sewage Installation, Heating Installation, Mechanical Ventilation Installation; C) Electrical Installations. The Aim Of The Works Is Also To Eliminate Architectural Barriers In The Modernized Garage And Maintenance Building, Because A Repair Point With Two Stations Is Planned In This Building. The Removal Of Barriers Will Also Allow Disabled People In Wheelchairs, Elderly People And People With Small Children To Use The New Building. The Contractor Is Obliged To Perform The Order In A Way That Ensures The Achievement Of This Goal. 4) Hardening Of The Square Surface. A) Hardening The Surface Of The Square With An Area Of 1861 M2 With A Concrete Surface With A Total Thickness Of 25 Cm, C30/37 W8 Concrete, Reinforced With Dispersed Reinforcement On A 15 Cm Thick Concrete Base, C12/15 Concrete. Slopes With Directions In Accordance With The Drawing Part Of The Study, B) Construction Of Storm Sewage Systems, C) Execution Of Electrical And Telecommunications Installations. 5) The Detailed Scope Of Works Is Specified In The Description Of The Subject Of The Order Constituting Annex No. 1 To The Swz, Which Consists Of Bills Of Quantities, Design Documentation And Specifications Technical Acceptance And Execution Of Works3. The Works Will Be Carried Out In The Conditions Of Current Operation Of The Waste Management Plant In Korczów At The Investment Site. The Ordering Party Requires That The Organization Of Work Allows For The Continuity Of The Tasks Performed By The Plant, Especially That The Period Of Exclusion From Use Of The Maneuvering Area Is As Short As Possible4. The Ordering Party Requires That The Works Performed Be Covered By A 60-Month Quality Warranty Period, Counting From The Date Of Final Acceptance Of The Works Without Any Reservations Or After Confirming The Removal Of All Defects Or Faults Identified In The Final Acceptance Report In The Warranty Acceptance Protocol.
|