Tenders Are Invited For Industrial Units Construction Work – Construction Of A Biomass Combustion And Biogas ... in Germany
Tender Notice
TenderID
91010430
Tender Brief
Tenders Are Invited For Industrial Units Construction Work – Construction Of A Biomass Combustion And Biogas Processing Plant At The Weißenfels Compost Plant Lot 5: Bgaa Biogas Processing Plant
Industrial Units Construction Work – Construction Of A Biomass Combustion And Biogas Processing Plant At The Weißenfels Compost Plant Lot 5: Bgaa Biogas Processing Plant. Lot 5: Biogas Processing Plant Bgaa ------------------------------------------- ----------- The Biogas Produced In The Fermenter Is To Be Processed In The Biogas Processing Plant (Bgaa) Using Chemical Washing To Produce Biomethane That Can Be Fed In, So That It Can Be Fed Into The Local Natural Gas Network By The Gas Network Operator Using The Biogas Feed-In Plant (Bgea). Can. Capacity Of The Bgaa: All Components Must Be Designed So That The System Can Safely Process At Least 500 Nm³/H Permanently. Underperformance (Tolerance) Of Individual Units Must Be Taken Into Account And A 10% Capacity Reserve Must Be Provided For The Entire Bgaa (Maximum Capacity 550 Nm3/H). The Bgaa Will Essentially Include: - Pre-Cooling And Pressure Increase Of The Raw Biogas - Option: Pre-Cooling Using A Gas Scrubber - Desulfurization Using Redundant Activated Carbon Filters - Optional: Voc Removal Using An Activated Carbon Filter - Amine Scrubbing For Co2 Separation Including Regeneration Of The Amine - Gas Analyzes - Compressed Air Supply - Biomethane Cooling - Biomethane Adsorption Drying - Pressure Booster For Biomethane - Pipelines And Fittings From The Bgaa Raw Biogas Inlet Flange To The Bgaa Outlet Flange (Internal Piping Between The Transfer Points) - Piping Parts For Raw Biogas Supply And Waste Gas Return And Their Integration Into The Inventory. The Contractors Scope Of Delivery And Services Includes The Turnkey Construction And Commissioning Of The Gas Processing Plant. This Includes All Plant Areas And All Services That Are Necessary For The Turnkey Construction Of The Gas Processing Plant And Its Connection To The Existing Biogas Plant, Even If They Are Not Mentioned Below. Excluded Are The Services That Are Expressly Named As On-Site Services In This List Of Services. The Deliveries And Services Include In Particular, But Not Exclusively: - Implementation Planning Of The Gas Processing Including Installation, Interface, Foundation And Load Plan - Significant Support To The Client And Provision Of The Necessary Documents When Applying For Change Permits, Provided That These Differ From The Existing Permits (E.G . Bimschg) Should Become Necessary - Production Of All System Components, According To The Implementation Planning - Delivery Of All System Components To The Construction Site - Raw Biogas, Condensate And Bad Gas Connections The Existing Structure - Construction And Ready-To-Use Assembly On The Foundations Created On Site. The Foundation And Civil Engineering Work To Create The Required Foundations Is Carried Out On Site Based On The Contractors Specifications. If The Contractor Prefers The Construction Of A Floor Slab, This Must Be Stated And Justified; The Current Planning Envisages Point And Strip Foundations In An Asphalt Area. The Verifiable Statics Of The Bgaa (Containers And External Trades) Including Load Distribution Plans And The Design Of The Foundations (Formwork And Reinforcement
Contact Information
Contact No.
+49344452230
Email
info@awsas.de
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 91010430
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.