Works For Complete Or Part Construction And Civil Engineering Work – Mps Hartenrod Replacement Sports Hall, Earthworks, Shell Construction, Drainage, Water Supply. Approx. 130M Of Pipe Trenches For Drainage Up To 1.75M Deep, Approx. 225M Of Electrical Trenches Up To 1.40M Deep, Approx. 3630M³ Of Construction Pit Loosening, Loading And Disposal, Approx. 1696M² Of Concrete For Floor Slab C25/30, Approx. 33M³ Of In-Situ Concrete Walls + Base, C25 /30, D=20-25Cm, Approx. 799M² Of Thermal Insulation Under The Floor Slab, Approx. 313M² Of Base And Perimeter Insulation Panels, D = 6-20Cm, Approx. 130M Of Concrete Pipes, Dn 300Mm Mixed Sewer Supply, Laying, Including Earthworks, Approx. 380M² Of Sewer Route And Approx. 110M² Of Water Pipe Route Restoration As Asphalt Surfaces (Ac 32 Ts = 14Cm / Ac 11 Ds = 4Cm), Including Earthworks And Substructure Work, Deliver, Manufacture, Including Ancillary Work, Approx. 1 Piece Of Large Container (21,000 L) And Approx. 1 Piece Of Cistern (5,700 L), Deliver, Lay, Including Earthworks, Approx. 175M Pp -Pipes, Dn/Od 160Mm - Sn12 And Approx. 115M Pp Pipes, Dn/Od250mm For Rain, Waste And Mixed Sewer Supply, Lay, Including Earthworks, Approx. 12 Pieces Of Prefabricated Concrete Shafts Dn 1000Mm And Approx. 6 Pieces Of Pp Prefabricated Shafts Dn 800Mm Deliver, Relocate, Including Earthworks / Approx. 122M Pp- Pipes, Dn/Od 160Mm - Sn12 For Approx. 28 Pieces Of Side And Supply, Lay, Connect House Connection Lines, Including Fittings And Earthworks, Approx. 50M Of Pvc Empty Cable Pipe, Da 110. Deliver, Lay, Including Earthworks / Approx . Deliver And Lay 200M Of Pe-Xa Pipes Dn 32, Including Fittings And Fittings, Including Earthworks
|