Construction Work - Framework Agreement - Deep Construction Works 2025. Framework Agreement For The Implementation Of Civil Engineering And High-Rise Construction Works Organically Related To It Budapest Vi. In The Administrative Area Of The District. Continuation Of Section Bt-24 Of The Call [Ted-Version 2.1. Point; Ekr-Version Ii.1.4) Point] The Pavement Network Of The District Is Predominately, ~95%, With A Cast Asphalt Surface, The Part Affected By Renovation / Reconstruction Is ~8,600 M In Length ~42,000 M2, The Affected Pavement Surface With Other Pavement Is ~3,000 M2. During The Reconstruction, Public Utilities May Be Replaced In The Affected Area As Planned, Or In Unforeseen Quantities And With Public Utilities Affected. During The Reconstruction, Part Of The Existing Pavements Can Be Implemented With Natural Stone Or High-Quality Prefabricated Paving Stones. The Road Network Is Predominately ~95% Rolled Asphalt Concrete Surface, The Part Affected By Renovation/Reconstruction Is ~12,500 M Long, 7.3 M Wide And ~91,250 M2. During The Reconstruction, The Involvement Of Existing Public Utilities Cannot Be Ruled Out, Their Replacement May Occur To The Extent Necessary. At Least 100 Tree Plantings And The Creation Of Other Green Areas Are Expected On The Public Areas Freed Up By The Transformation And Elimination Of The Existing Parking Spaces (Shrub Planting, Plant Cassettes, Beds With Herbaceous Plant Planting, As Well As The Creation Of An Irrigation Network, Placement Of Street Furniture [Bicycle Supports, Pergolas, Benches, Tables, Waste Collectors]). On The Road Sections Affected By The Reconstruction, It Is Necessary To Expect A Change Of Pavement Type, Partly In The Form Of Natural Stone Or High-Quality Prefabricated Paving Stones. ~5% Of The Road Network Is To Be Renovated With Large-Cube Stone Covering ~870 M In Length On ~7,600 M2. Edging ~8,000 M Of Granite Edging To Be Renovated, 8,600 M Of Other Usable Natural Stone Or Prefabricated Concrete Edging. A.2) Expected Quantitative Data Of The Project Involved In The Reopening (Ordering) Of A Competition: The Renovation/Reconstruction Of The Existing Road And The Pavement Network Will Be Carried Out Simultaneously As Planned In Sections Of 2,000 M, Planned At The Same Time In Several Separate Locations, Construction Of 14,600 M2 Of Road Surface And / Or Renovation (The Substrate Of Which Can Be Either Rolled And Cast Asphalt, Paving Stones, Natural Materials Stone Pavement As Well As Stabilized Pavement), Construction Of 4,000 M Of Curbs (The Material Of Which Can Be Either Concrete, Natural Stone, Or Metal Curbs), Installation Of 100 Traffic Signs And/Or Columns And Additional Signage, Replacement Of Sewers And/Or Drinking Water Pipes To The Extent Necessary , Utility Fittings (Closing Cabinets, Utility Manholes, Sinks, Fire Hydrants, Etc.) Level Installation And/Or Reconstruction, And By Creating Traffic Calming Thresholds (Speed Limit Zone). It Is Planned To Renovate The Existing Space In A Complex Way At The Same Time, On Several Separate Locations, The Quantity To Be Fulfilled At The Same Time For 1 Location Is At Least 3,800 M2 Of Area, Which Quantity Includes The Design And Renovation Of 1,800 M2 Of Green Space,
|