Stage Contract For Repairs Replacement Of Damaged Spare Parts Including Scheduled Servicing (As And When Required) Of Various Departmental Vehicles Of Tata Make, Backhoe Loaders Comprising Jcb 3Dx-Super And Digmax Ii Of Jklcma -1 TATA Make 2 Departmental Vehicle bearing No. JK01AG-6651 (TATA 407) 3 Schedule Servicing:- The job shall include providing and filling of POL's and spares as and when required 4 Replacement of Exhausted/contaminated Engine oil by fresh oil of grade 20 w 40 =Qty @ 09 liters/Job 5 Replacement of Exhausted/damaged Oil filter by new one 6 Replacement of Exhausted/damaged Fuel filter (water separator) by new one 7 Replacement of Exhausted/damaged Air cleaner element. Primary 8 Replacement of Exhausted/damaged Air cleaner element. Secondary 9 Replacement of Exhausted/contaminated Gear oil by fresh oil (80 W 90 ) =Qty @ 08 liters/Job 10 Replacement of Exhausted/damaged steering oil filter by fresh one 11 Replacement of Exhausted/contaminated steering oil by fresh one =Qty @ 2.5 liters/Job 12 Repair/ replacement of turbo repair kit 13 Brake booster kit Providing and Fitting: The Job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the Job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machine and the chambers be finished to the required size .Further the requisite new brake booster kits be fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning ( Front Wheel) 14 Brake booster kit Providing and Fitting: The Job shall include dismantling of the brake boosters form the Truck and taking the same to the workplace of the contractor. Thereafter, the Job shall include further dismantling the brake boosters ascertaining of the faults. Further the chambers of the booster be taken over the machine and the chambers be finished to the required size .Further the requisite new brake booster kits be fitted if required. Assembling back the chambers to the booster assembly and bring the same to the workshop for further fitment to the machine to check for the proper functioning (Rear Wheel) 15 Propeller Shaft:- 16 Machining Job of the Propeller shaft along with providing and fitting of Universal Joint and clamps The Job includes dismantling of propeller shaft from the Vehicle at site and the propeller shaft be taken to the contractor’s workplace for further execution of Job over the Lathe machine. During machining, torsions need to be checked thoroughly and rectified. Both the ends of the propeller shaft may need cutting. A new half yoke to be fitted by way of welding along with a new universal joint and cross holder .The alignment of the assembly be finished and checked over the lathe machine once again. The spares once fitted and assembled need to be checked over Lathe machine to ensure the zero error before proceeding further .After the Job is complete the same needs to be carried back to the site for further fitment to the machine. The tipper needs to be tested thoroughly after fitment for ascertaining the quality of the Job. 17 Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 18 U-J Cross 19 Cross Holder 20 Coupling 21 Half Yoke 22 Central Bearing with rubber Assembly Complete 23 Shaft Bolts with Nuts and Washer. 24 Main brake booster pipe 25 Clutch Plate 26 Pressure plate 27 Clutch Release Bearing. With Hub 28 Fly Wheel Ring 29 Fly Wheels Bolts 30 Fly Wheels Bolts 31 Suspension System: 32 Augmentation of Leaf Springs (Rear): The Job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension, followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 33 Re-Arching of the existing for rear suspension: The Job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension, followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 34 Augmentation of Leaf Springs (Front): The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 35 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the truck completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the truck and greased properly to make the assembly work smoothly. 36 Scope of work shall include Providing and fitting of damaged/ worn-out spare parts with new one as per details below 37 Providing and fitting of leaf springs and allied spares as per requirement 38 Auxillary Rear Leaf 39 Leaf Spring Clamps 8" 40 Leaf Spring Clamps 5" 41 Leaf Spring rivets 42 Leaf Spring Bush 43 Centre Bolt 44 Gear Box Bolt 45 Tappet Cover Gasket 46 Leaf Spring Bolt 47 Leaf Spring Cotter 48 U-Bolt 18'' 49 Wheel System 50 Four wheel checking including lubes and necessary seals 51 Scope of work shall include Providing and fitting of damaged/ worn-out spare parts with new one as per details below 52 Front Wheel oil seal 53 Tie Rod Ball Set 54 F/W Bearings. Inner 55 F/W Bearings. Outer 56 Front brake lining sets 57 Rear brake lining sets 58 Slack Adjuster Automatic 59 Real wheel oil seal 60 R/w Bearings. Inner 61 R/w Bearings. Outer 62 Wheel Cam bush 63 Wheel Cam oil Seal 64 Fuel Injection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 65 Complete overhauling of the Fuel Injection Pump alongwith nozzles.The job shall comprise taking of the dismantled fuel pump assembly alongwith nozzles from the workshop and examining the same for further job to be executed. It shall further checked for the damaged/worn out spares for replacements, comprising ,Element Set(01 Set of 04 Nos),Delivery Valve(01 Set of 04 Nos),Complete Nozzle set replacement(06 Nos),Taper Roller bearing(01 Set),Nozzle Cups(06 Nos),Cross Disc(01 No),T quadrant(02 Nos) and Camplate(01 No).Upon replacement of the mentioned spares the Fuel Pump shall be assembled and tested for the proper atomisation in order to have the correct fuel to the fuel injector in correct timing and the accurate metered amount of fuel with sufficient pressure from the nozzles over the Diesel Pump testing machine.Once the job gets completed,the Fuel Pump shall be brought back to workshop for further fitment to the Truck.The job shall get executed by a highly skilled proffesional only. 66 All Nozzle testing & calibration 67 Steering System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 68 Steering. Cross 69 Self starter :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 70 Armature Assembly 71 Self Carbon bush set 72 Self bearing 73 Bendex Drive 74 Solenoid Switch 75 Field Coil Set 76 Battery Lead 8 AWG gauge multistrend with copper Thimbles and terminals etc. Both negative and positive 77 Re-building of battery poles. 78 Ignition switch 79 Alternator Assembly:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 80 Rectifier plate 81 Carbon Bush Set 82 Cut out 83 Armature Assembly 84 Armature Bearing 85 Silencer:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 86 Joint & Bolts 87 Silencer Gas Welding and Patching 88 Radiator Assembly;-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 89 Radiator Cup 90 Hose pipe Sets upper & lower with Clamps 91 Radiator Leakage Arrest by way of soldering, carbon leakage testing, cleaning of radiator cooling fins & servicing. Besides the job shall include dismounting & remounting of radiator by way of engaging of skilled machanic on the job. 92 Electrical Works:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 93 New T-Horn Assembly 94 Head Light Assy. 95 Head Light bulb 96 Tail light bulb 97 Indicator bulb 98 Tail light Assy 99 Cab. Light 100 Side Indicator Assy. 101 Combination Switch. 102 Ignition switch 103 Brake System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 104 Brake Front & Rear Cylinder Assy. 105 Master Cylinder 106 Front & Rear Brake Cam 107 Air Pressure Pipes 108 Brake pipe 109 Diaphagram Washer of Brakes 110 Window Glasses and Front wind shield:-Scope of work shall include Providing and fitting of damagedwind screen along with beading with new one as per details below (triplex laminated) 111 Front Glass/Wind Shield Triplex laminated with rubber beeding and other allied fittings 112 window Glass Right 113 Window Glass Left 114 Fan Belt set 115 Tyres 116 P/F of tyres of requisite size as per OEM recommendation Rib & Lug pattern type, two for each pattern type. =Qty@ 2no’s front Tyres (rib type) & 2 no’s (Lug type) per job 117 Painting of rear body in two coats after applying two coats of red oxide. The job shall include scrubbing of old damaged paint using appropriate tools. 118 TATA Xenon & TATA Yodha 119 "Scope of work: Maintenance Rate Contract for repairs/replacement of damaged spare parts including scheduled servicing (as and when required) of departmental (Pickup) vehicles of following details: Make: TATA Model: Xenon & Yodha Year of manufacturing: 2020 & 2022 The job includes disassembling, removal of damaged/worn out/outserviced items and reassembling after replacement by new one. the job includes P/F of the following items" 120 Schedule servicing 121 Moil grade 20w40 (6 liters per service) 122 P/F of Oil filter 123 P/F of Fuel filter element delphi 124 P/F of Fuel pre- filter element 125 P/F of Air cleaner element. 126 P/F of Gear oil Change 80W90 (10 liters per service) 127 P/F of Brake fluid (Dot-4).250 ML 128 P/F of Power steering fluid 500ml 129 Clutch system:- Scope of work shall include Providing and fitting of damaged/ worn-out spare parts with new one as per details below 130 Replacement of damaged Clutch plate by new one 131 Replacement of damaged Pressure plate by new one 132 Replacement of Clutch release bearing 133 Replacement of Clutch oil seal 134 Replacement of Clutch cable 135 Wheel: System 136 Four Wheel Checking including lubes and necessary seals 137 Scope of work shall include and fitting of damaged/worn out spare parts with one as per details below: 138 Replacement of Front wheel inner bearing 139 Replacement of Front wheel outer bearing 140 Replacement of Front wheel oil seal 141 Replacement of Steering Tie rod end 142 Replacement of Steering centre pin bush 143 Replacement of Steering Ball joint 144 Replacement of Complete suspension bush kit 145 Replacement of Rear brake shoe set (set of 2 pairs) 146 Replacement of Rear brake wheel cylinder 147 Replacement of Rear wheel bearing 148 Replacement of Disc pad set 149 Replacement of Calliper set 150 Replacement of Brake fluid 200ml 151 Replacement of Providing/fitting of disc rotor 152 Replacement of Providing/fitting of front breake disc pads 153 Providing of skilled mechanic shall capable to hadle all kinds of mechanical automobile jobs included providing of tools & tackels required for thr job. 154 Silencer 155 Repairs to silencer by way of gas welding the job included dismounting & remounting of silencer 156 Silencer tail pipe 157 Electrical system 158 Replacement of Alternator cut out 159 Replacement of Alternator rectifier plate 160 Replacement of Alternator bearing 161 Replacement of Alternator brush set 162 Replacement of Fan belt 163 Self starter.Scope of work shall include and fitting of damaged/worn out spare parts with one as per details below: 164 Replacement of Self bush 165 Replacement of Self bearing 166 Replacement of Solenoid switch 167 Replacement of Battery 80 AH 168 Replacement of Battery terminal and thimbles & rebuilding of battery Poles 169 Replacement of Head light assembly 170 Replacement of Side indicator assembly 171 Replacement of Back light assembly 172 Replacement of Horn assembly 173 Replacement of Back light bulb 174 Replacement of Side indicator bulb 175 Replacement of Horn relay / Horn 176 Replacement of Wiper blade set 177 Replacement of Wiper arm set 178 Body side Scope of work shall include and fitting of damaged/worn out spare parts with one as per details below: 179 Replacement of Door handle ( Outside ) 180 Replacement of Door handle ( Inside ) 181 Replacement of Door trim 182 Replacement of Door glass sliding handle 183 Replacement of Door lock 184 Replacement of Side mirror (L/R) 185 Repairing of damaged body by way of Welding/denting/painting of various spots on the body 186 Suspension System Scope of work shall include and fitting of damaged/worn out spare parts with one as per details below: 187 Replacement of leaf spring U bolts( Rear) 188 Replacement of leaf spring centre bolt( Rear) 189 Shakel pin/bolt ( Rear) 190 Replacement of leaf spring clip with bolt( Rear) 191 Steering System 192 Wheel alignment 193 Differential Scope of work shall include providing anf fitting of damaged/wornout spare parts with new ones as per details below 194 Differential Assembly 195 Bevel and Pinion Gear 196 Star Gear 197 Star set 198 Replacement of Diff. Stud 199 Replacement of U-J Cross 200 Replacement of Cross Holder 201 Replacement of Coupling 202 Replacement of Central Bearing. Assembly Complete 203 Tyres 204 Providing and fitting of tyres of requisite size as per OEM recommendation tyres size 700-16 LT 205 Departmental Sewer cleaning Machine (TATA)-JK01AB-6145(TATA 1613) 206 Schedule Servicing:- The job shall include providing and filling of POL's and spares as and when required 207 Providing and Filling Engine oil grade 20 w 40 = Qty @ (16 Ltrs+04 Ltrs) per job 208 Providing and Fitting Oil filter + Bosh 6D 2525-181-30139 209 Providing and Fitting Fuel filter (water separator) 2527-091-20259 210 Providing and Fitting Air cleaner element. Primary 2786-091-39908 211 Providing and Fitting Air cleaner element. Secondary 2786-091-39909 212 Providing and Fitting Water body Assembly 213 Providing and Fitting Gear oil Change 80 W 90 =Qty @ (12 ltrs +07+07 ltrs) Per job 214 Propeller Shaft:- Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 215 Machining job of the Propeller shaft along with providing and fitting of Universal Joint and clamps The job included dismantling of propeller shaft from the vehicle at site and the propeller shaft was taken to the contractor’s workplace for further execution of job over the Lathe machine. During machining, torsions were checked thoroughly and rectified. Both the ends of the propeller shaft were cut. A new half yoke was fitted by way of welding along with a new universal joint and cross holder .The alignment of the assembly was finished and checked over the lathe machine once again. The spares once fitted and assembled were checked over Lathe machine to ensure the zero error before proceeding further .After the job is complete the same was carried back to the site for further fitment to the machine,. The machine was tested thoroughly after fitment for ascertaining the quality of the job. 216 U-J Cross 217 Cross Holder 218 Coupling 219 Half Yoke 220 Central Bearing with rubber Assembly Complete 221 Shaft Bolts with Nuts and Washer. 222 Main brake booster pipe 223 Clutch Plate 224 Pressure plate 225 Clutch Release Bearing. With Hub 226 Fly Wheel Ring 227 Fly Wheels Bolts 228 Suspension System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 229 Augmentation of Leaf Springs(Rear): The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 230 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 231 Augmentation of Leaf Springs (Front): The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 232 Re-Arching of the existing for Front suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 233 Re-Arching of the existing for rear suspension : The job shall include dismantling of the rear wheel spring assembly of the vehicle completely on both sides, one at a time with the help of jacks. The leaf springs shall be cleaned and hammered/tempered by jack devices up to the required shape and requisite tension , followed by greasing. Two numbers of new leaf springs are to be added on both sides by putting the leaf spring in position and inserting the mounting bolts and retainer Nuts at each end to secure the springs to the rear hanger. The U Bolt brackets are to be placed around the leaf spring and rear axle. The whole operation shall comprise replacement of, eyelet bolts from the eye bushes, shackle pins, center bolts, U Clamp with bolt washers, rear hanger washer and other requisite spares. The whole assembly shall be fitted back to the vehicle and greased properly to make the assembly work smoothly. 234 Wheel System :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 235 four wheel Checking including lubes and necessary seals 236 Front Wheel oil seal 237 Tie Rod Ball Set 238 F/W Bearings. Inner 239 F/W Bearings. Outer 240 Front brake lining sets 241 Rear brake lining sets 242 Slack Adjuster Automatic 243 Real wheel oil seal 244 R/w Bearings. Inner 245 R/w Bearings. Outer 246 Wheel Cam bush 247 Wheel Cam oil Seal 248 Fuel Injection Pump:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 249 Complete Overhauling /calibration, including replacement of worn out/ necessary items. The job shall include testing of the same along with the nozzles on test bench checking & calibration etc. with necessary replacement of damaged items. 250 Nozzle checking & calibration etc. 251 Steering System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 252 Steering. Cross 253 Steering. Oil 254 Steering filter 255 Self starter :-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 256 Armature Assembly 257 Self Carbon bush set 258 Self bearing 259 Bendex Drive 260 Solenoid Switch 261 Field Coil Set 262 Battery Lead 8 AWG gauge multistrend with copper Thimbles and terminals etc. Both negative and positive 263 Battery 12 volts 180AH 264 Re-building of battery poles. 265 Ignition switch 266 Alternator Assembly:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 267 Rectifier plate 268 Carbon Bush Set 269 Cut out 270 Armature Assembly 271 Bearing 272 Silencer:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 273 Joint & Bolts 274 Silencer Gas Welding and Patching 275 Radiator Assembly;-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 276 Radiator Cup 277 Hose pipe Sets upper & lower with Clamps 278 Radiator Leakage Arrest by way of soldering, carbon leakage testing, cleaning of radiator cooling fins & servicing. Besides the job shall include dismounting & remounting of radiator by way of engaging of skilled machanic on the job. 279 Fan Belt set 280 Electrical Works:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 281 New T-Horn Assembly Double 282 Head Light Assy. 283 Head Light bulb 284 Tail light bulb 285 Indicator bulb 286 Tail light Assy 287 Cab. Light 288 Side Indicator Assy. 289 Combination Switch. 290 Ignition switch 291 Brake System:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 292 F/W Brake Lining Set with Rivets 293 Rear/W Brake Lining Set with Rivets 294 Brake Front & Rear Cylinder Assy. 295 Master Cylinder 296 Front & Rear Brake Cam 297 Air Pressure Pipes 298 Brake pipe 299 Diaphagram Washer of Brakes 300 Window Glasses and Front wind shield:-Scope of work shall include Providing and fitting of damagedwind screen along with beading with new one as per details below (triplex laminated) 301 Front Glass/Wind Shield with rubber beeding 302 window Glass Right 303 Window Glass Left 304 JETTING SYSTEM:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 305 Overhauling, repairs & replacement of spares of jetting reciprocating pumps of sewer cleaning machines of serial no 79/14 & 81/14 Pump type D6.5/20 WASP PUMP PRIVATE LTD.The job shall included dismounting & remounting of complete pump from the machine dismantalling there of, replacement of all damaged/worn out spares to keep the pump operational complete. 306 VACUUM PUMP SYSTEM:-Scope of work shall include Providing and fitting of damaged/ wornout spareparts with new one as per details below 307 Repairs to Sucking pump make Battioni Pagani (CE) sorbolo (parma) Itali Mec 13500 P LF DX D100 .Sno 448871 & 448370 year 2014.Mx. Pressure 1.5 (bar), Vaccuum-0.95, power(kw) 36 , Reves (rpm) 1400 , Capacity (1/min) 13845, weight (g) 164. of sewer cleaning machine bearing no 0772-JK01AB & 6145-JK01AB, The job shall include dismounting of complete suction pump from the machine, Shifting to work shop of contracting agency dismantalling thereof. The jo0b shall included replacement of all damaged spares viz, bearing 02no, fiber blades, o-rings, copper pipe with adopter, oil seal & gasket kit complete job.Besides the job shall further includefinshing of uneven bore suface of suction pump by way of grinding, honing & polishing finishing of rottor bearing seats by way of machineing job.Re-assembling & remounting of sucker pump on machine after caried out necessary repairs, checking the performance of pump unit on full load. 308 Providing & fixing of PTO electronuematic valve 24 volt. 309 Ball valve (jetting pipe)25mm dia of SS/GM material in single piece, heavy duty, shall working pressure 3000 /4000 bar maximum pressure of CIM make or any other reputed make as per the sample.. 310 Welding repairs to tank buffer wall by way of providing & fixing of 6 mm MS plate ISA 32/50 mm/as per site requirment. The job shall furhter include straighten, bending, cutting, hosting & welding complete job, applying two coats of red oxide coat after preparing the surface smooth by way of using of grinder, emaray paper etc. 311 Repairs to high pressure jetting pipe p/f of end joints /connections & adopters crimping collers as per sample hydraulically/electrically operated crimping machine to the HP- jetting hose 25mm ID with working pressure 3000PSI sewer cleaning machine. 312 Providing & fixing of jetting hose pipe 25mm inner dia 1 mt long with end connections. Working pressure 3000 bar /PSI. 313 Providing & fixng of (Sewer sucking pipe) 100 mm dia, wire braided synthatic rubber/PVC material with high suction resistance 4.5 mt long included providing & fixning of end fitting/ coupling & decoupling system for quick operation as per sample. 314 Tyres 315 P/F of tyres of requisite size as per OEM recommendation Rib pattern type, with size 10.00-20 316 P/F of tyres of requisite size as per OEM recommendation Rib pattern type, with size 10.00-20 317 JCB 3dx-Super & DIGMAX II 318 Schedule Servicing:- The job shall include providing and filling of POL's and spares as and when required 319 Replacement of Exhausted/contaminated Engine oil by fresh oil of grade 20 w 40 .=Qty @ 15 litres/Job 320 Replacement of Exhausted/damaged Oil filter by new one 321 Replacement of Exhausted/damaged Fuel filter (Primary) by new one 322 Replacement of Exhausted/damaged Fuel filter (Secondary) by new one 323 Replacement of Exhausted/damaged Air cleaner element set. inner & outer 324 Replacement of Exhausted/contaminated Gear oil by fresh oil (80 W 90 )=Qty @ 55 litres/Job 325 Replacement of Exhausted/contaminated Hydraulic oil by fresh oil of grade 68.=Qty @ 92 litres/Job 326 Replacement of Exhausted/contaminated Hydraulic oil Filter 327 Replacement of Exhausted/contaminated Hydraulic oil Strainer 328 Replacement of Exhausted antifreeze coolant by fresh one 329 Propeller Shaft: 330 The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 331 Cross joint spider kit 332 Drive shaft rear SS700 side shift. 333 Crane boom:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details: 334 Pivot pin lever/link 335 Pivot pin lever/Dipper 336 Pivot pin Dipper ram dump end 337 Pivot pin boom dipper 338 Ram steering kit. 339 Tilt cylinder kit 340 Loader lift cylinder kit 341 Ram sleeve /swing ,slew AB1 seal kit 342 Ram stabilizer seal kit right & left 343 Ram boom spare seal kit. 344 Ram Dipper spare seal kit. 345 Bucket crowd kit seal 346 Bucket:spares by new one on as and when required basis with following details 347 Side cutter 348 Tooth Bucket 349 Lock Nuts & bolts for bucket tooth 350 Cab:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details: 351 Glass wind screen 352 Glass Door upper 353 Glass Door Lower 354 Glass window side rear 355 Glass rear 356 Gas shocker door. 357 Lock Back assembly. 358 Mounting pad cab upper & Mounting pad cab Lower 359 Catch window lock back 360 Mirror rear view with bracket. 361 Wiper blade 362 Wiper Arm 363 Self for JCB Back hoe Loaders:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details: 364 Armature Assembly 365 Self Carbon bush set 366 Self bearing 367 Bendex Drive 368 Solenoid Switch 369 Field Coil Set 370 Battery terminals /Lead sets 371 Alternator for JCB Back hoe Loaders:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 372 Rectifier plate 373 Carbon Bush Set 374 Cut out 375 Armature Assembly 376 Oil Seal 377 Bearing 378 Electrical for Escorts & JCB Back hoe Loaders:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 379 T- Horn Assembly Double 380 Fog Light 6 inch including providing of 6mm wire. 381 Providing & fixing of multistrand 6mm copper insolated copper wire. 382 Replacement of high pressure hydraulic hose pipes as per the specifications :- tube with high quality synthetic rubber compounds, reinforcement with high tensile steel wire two- braided /multi-braided shall with stand for above 2500-3500 Pounds /PSI , cover /abrasion & weather/oil resistance synthetic for hydraulic lake cleaning machines. complete with end fitting for Escorts & JCB Back hoe Loaders 383 Hose pipe 1"( inch) ID complete with end fitting /as per sample 384 Hose pipe 1/2"( inch) ID complete with end fitting /as per sample 385 Hose pipe 1/4"( inch) ID complete with end fitting /as per sample 386 Hose pipe 3/4"( inch) ID /complete with end fitting /as per sample 387 Hose pipe 3/8"(one inch) ID complete with end fitting /as per sample 388 Providing & fixing of end fittings one end which included connection nipple & hose crimping collar of assorted size from 1, 1/2,1/4,3/4 & 3/8 inch by way of crimping hyd pressing machine. 389 NEW ESCORTS BACK HOE LOADER MODAL DIGMAX II4X4. 390 Schedule Servicing:- The job shall include providing and filling of POL's and spares as and when required 391 Replacement of Exhausted/contaminated Engine oil by fresh oil of grade 20 w 40 =Qty @ 11.5 litres/Job 392 Replacement of Exhausted/damaged Oil filter by new one 393 Replacement of Exhausted/damaged Fuel filter (Primary) by new one 394 Replacement of Exhausted/damaged Fuel filter (Secondary) by new one 395 Replacement of Exhausted/damaged Air cleaner element set. inner & outer 396 Replacement of Exhausted/contaminated Gear oil by fresh oil (80 W 90 )=Qty @ 34 litres/Job 397 Replacement of Exhausted/contaminated Hydraulic oil by fresh oil of grade 68.=Qty @ 110 litres/Job 398 Replacement of Exhausted/contaminated Hydraulic oil Filter 399 Replacement of Exhausted/contaminated Hydraulic oil Strainer 400 Replacement of Exhausted antifreeze coolant by fresh one=Qty @ 15 litres/Job 401 Propeller Shaft:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 402 Cross joint spider kit 403 Drive shaft rear SS700 side shift. 404 Crane boom :The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 405 Pivot pin lever/link 406 Pivot pin lever/Dipper 407 Pivot pin Dipper ram dump end 408 Pivot pin boom dipper 409 Ram steering kit. 410 Tilt cylinder kit 411 Loader lift cylinder kit 412 Ram sleeve /swing ,slew AB1 seal kit 413 Ram stabilizer seal kit right & left 414 Ram boom spare seal kit. 415 Bucket :The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details: 416 Side cutter 417 Tooth Bucket 418 Lock Nuts & bolts for bucket tooth 419 Cab:The scope of job is P/F of spares by way of replacement of damaged spares by new one on as and when required basis with following details 420 Glass wind screen 421 Glass Door upper 422 Glass Door Lower 423 Glass window side rear 424 Glass rear 425 Gas shocker door. 426 Lock Back assembly. 427 Mounting pad cab upper & Mounting pad cab Lower 428 Catch window lock back 429 Mirror rear view with bracket. 430 Wiper blade 431 Wiper Arm
|