Railway Construction Works – Rail Connection Fsq Alliance Contract In The Rail Partnership Model Vp04. Db Infrago Ag Is Planning A High-Performance Rail Connection Between Lübeck And Fehmarn As A Connection To The Fehmarnbelt Tunnel, Which Is Being Built By Denmark. The Rail Connection Project For The Fixed Fehmarnbelt Link (Fbq) Includes The Planning And Implementation Of A Rail Connection Between Lübeck And Fehmarn And The Associated Connection To The Fehmarnbelt Tunnel. The Expansion To Two Electrified Tracks Will Create Direct And Fast Train Connections Between Hamburg, Lübeck And Copenhagen In Long-Distance And Regional Transport For Commuters, Tourists And Freight Transport. With The Completion Of The Fehmarnbelt Tunnel, The Belt Region Will Grow Closer Together And The Necessary Capacity Will Be Created In The European Rail Network To Handle The Constantly Growing Traffic Flows Through Europe In A Long-Term And Environmentally Friendly Manner. In The State Treaty, Germany Committed Itself To Expanding The Railway Line Between Lübeck And Puttgarden To Double Tracks And Electrifying It. Where This Route Could Run In The Future Was Discussed In Advance As Part Of An Extensive Regional Planning Procedure (Rov) By The State Of Schleswig-Holstein Together With The Affected People, Municipalities And Local Authorities. Db Infrago Ag Is The Project Sponsor For The Total Of 10 Planning Approval Sections Into Which The Route Is Divided. The Planned Expansion And New Construction Measures For The Rail Connection For The Fehmarnbelt Fixed Link (Fbq) Have The Planning Title Abs/Nbs Hamburg - Lübeck - Puttgarden (Hinterland Connection Fbq). All Planning Approval Sections (Pfa) Are Located In Schleswig-Holstein And Are Under The Responsibility Of The Northern Regional Area Of Db Infrago Ag. Part Of The Overall Award (Vp 1-7) Is The Planning, Implementation And Commissioning Of The Sund Crossing (Plan Approval Section Fsq) In The Partnership Model Rail. The Plan Approval Section Fsq Is Part Of The Current Award Procedure And The Later Fsq Alliance. The Award Package (Vp) 4 Includes, Among Other Things, The Following Main Services: Road Construction B207neu, Adaptation/Production Of The Downstream Road Network With The Großenbrode/Fehmarn Slow-Speed Route, Operational And Economic Routes. Construction/Maintenance/Dismantling Of All Necessary Temporary Roads And Diversions, Escape Routes Including Rescue Areas, Road Drainage, Road Superstructure In The Tunnel And In The Troughs, Traffic Systems, Railway Operating Routes, Safety Tunnel Equipment According To Re-Ing2023 With Eabt 80/100, Technology For Operational Buildings/Control Technology/Outdoor Facilities, Equipment In Accordance With Re-Ing 2023, No Extraction In The Tunnel, Pump Systems In The Tunnel, In The Operating Buildings And In The Tunnel-Related Rain Retention Basins, Technology For Operational Buildings/Sub-Centres/Outdoor Facilities, Bi-Directional Traffic Data Collection Along The Entire Route, Traffic Sign Gantries With Both Stationary And Variable Traffic Signs, Equipment In Accordance With Re-Ing2023 With Eabt80/100, Connection Of The Systems To The Tlz In Hh, As Well As For
Contact Information
Address
Adam-Riese-Straße 11-13
Contact No.
+49 4039184584
Email
ilka.doerr@deutschebahn.com
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90965591
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.