Plastering Work – General Renovation Of Zugspitz-Realschule Garmisch-Partenkirchen / Plastering And Preliminary Work. Painting Work, Etics. Renovation Of The Zugspitz Secondary School In Garmisch-Partenkirchen: Plastering Work On New And Existing Interior Walls, Early Painting Work On Interior Walls And Ceilings For Installation Work, Interior Insulation Of Walls, Thermal Insulation Composite System On Exterior Walls. Execution: New Building Component 3 And Existing Components 1 And 2. Basement, Ground Floor, Upper Floor And Attic Execution Heights Basement-Floor: Up To Approx. 4.00 M, Top Floor: Up To Approx. 5.70 M Overview Of Essential Individual Services With Quantities: Approx. 2200 M2 Clean Underground Walls, Knock Off Approx. 300 M2 Of Concrete Burrs On Walls, Close Approx. 60 M Of Slots, Approx. 80 M2 Of Reinforcing Mesh Or Plaster Base, Approx. 120 M Corner Profiles, Approx. 70 M End Profiles, Approx. 400 M Quick Plastering Strip, Approx. 2200 M2 Adhesive Filler, Approx. 600 M2 Leveling Plaster Of Various Thicknesses, Approx. 50 Pieces. Repair Defects In Existing Plaster, Approx. 300 M2 Lime Plaster. Cement Plaster, Maximum Grain Size 1.3 Mm, Approx. 1500 M2 Lime-Cement Plaster, Maximum Grain Size 1.0 Mm, Approx. 600 M2 Lime-Cement Plaster As A Finishing Plaster, Maximum Grain Size 1.0 Mm, Approx. 80 M Plaster Placement, Approx. 50 M Plastering Over Pipe Slots, Approx. 130 Pieces Subsequent Plastering Of Bushings, Approx. 80 M Subsequent Plastering Of Doors And The Like, Approx. 600 M2 Initial Coating Mineral. Substrate Walls With Sol-Silicate Paint, Approx. 800 M2 Overhaul Coating Mineral. Substrate Walls With Sol-Silicate Paint, Approx. 250 M2 Initial Coating Mineral. Substrate Ceilings With Sol-Silicate Paint, Approx. 450 M2 Overhaul Coating Mineral. Subsurface Ceilings With Sol-Silicate Paint, Approx. 130 M2 Of Internal Wall Insulation With Mineral Insulation Boards, Thickness 80 Mm, Plastered, Including Preparationsubsoil And Side Insulation, Approx. 200 M2 Of Thermal Insulation Composite System On External Walls With Mw Insulation Boards, Plastered Incl. Painting Work, Bases And The Like .Dates:Start Of Execution: 03/10/2025 Completion Date: 07/11/2025 Intermediate Dates: (Advanced) Plastering Work, Early Painting Work (In Technical Rooms, Where Necessary) 03/10/2025 To 03/28/2025 Interior Wall Insulation: 03/17/2025 To 04/04/2025 Remaining Plastering Work (Main Service): Component 1/2: June 2, 2025 To June 13, 2025, Component 3: June 30, 2025 To July 11, 2025 Thermal Insulation Composite System May 5, 2025 To June 13, 2025 In Coordination With The Facade Construction Company Of The Wooden Facade
|