Quotation Are Invited For Replace Condenser Coil 1032406081 1 Item-00001 Condenser Coil Replacement In Pu3-1@Doharoadnod Ref: 420530772Supply And Installation Of Condenser Coils (Cu To Cu) In Package Unitp U3-1 At Doharoad 132Kv Substation.Sap Equipment # 30347173Substation Name Doharoad 132 Kvpackage Unit Pu3-1Make: Zamil Cooline; Mo Del: Prl020ldccdknvjmgeaa; Sl # Lmnzd0003mno Of Refrigerant Circuits 02.Note: Condenser Coil Shall Be Made From Good Quality Seaml Ess Coppertubes Integral With Copper Fins And Good Quality Corrosion Resistantcoating Such As Bronze Glow Husky Gold Coating , Therm Oguard Or Heresitecoating To Work Properly With All Other Components Of The Existing Accuunit. It Shall Be Marine Coating As Per The Designated Location Of Thesubstationthe Coated Fins Shall Be Mechanically Bonded With The Seamless Coppertube. Contractor 1 Ea Shall Tak E All Required Details And Actual Measurementsat Site. After Manufacture, The Entire Inner Portion Of Condenser Coilhas To Be Flushe D Properly To Remove Any Traces Of Foreign Materials,Oil, Dust Etc.Also, All Pressure Gauges Shall Be Replaced With New Gauges Inclu Ding Changing Of Compressor Oil By The Contractor.Associated Defects Shall Be Rectified By The Contractor Including Changeof Drier C Ore, Compressor Oil And Flexible Hose Pipe For Lp/Hp Etc.The Contractor Shall Give Minimum 2 Years Warranty For The Entire Scopeof W Orks Including Coils And Fins And Minimum 7 Years For The Coating.The Condenser Coils Shall Be Tested Successfully To Withstand A Mi Nimumpressure Of 450 Psi.For Pearljum Substation, Please Contact: Mr. Abdulla Mohamed, Engineer(Mob: 0555492824).Payment Terms And C Onditions:Penalty: The Contractor Shall Complete This Work Within 1 Year Of Porelease Date, If The Work Is Delayed Beyond That Then; Dewa Is Entitledto A Reduction In The Po Value By 1.25% Per Week Of Delay And Subject Tomaximum 10% Of Po Value.Retention Amount: 5 % Of The Total Value Of The Po Will Be Kept As Aretention Amount For 1 Year After The Completion Certificate Is Issued,It Will Be Re Leased To The Contractor Upon Clearing All Related Nods Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2332500039)/$Value
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90874038
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.