Construction Work – Preparation Of Executive Documentation And Implementation Of Construction Works, As Part Of The Project Entitled Works On Line E 75 On The Białystok - Suwałki - Trakiszki Section (State Border), Stage I, Białystok - Ełk Section, Phase Ii. 1. The Subject Of The Order Is The Execution Of The Following Elements: Development Of Executive Designs And Execution Of Construction Works For: - Modernization And Construction Of Line No. 38 As A Double-Track Line On The Section From Existing Km 3+591 To Existing Km 98+800; - Reconstruction Of Lines 515, 516 And Leaving Single-Track Sections: Line No. 515 On The Section From Km Ist. 1+278 To Km Ist. 1+915, Line No. 516 On The Section From Km Ist. 1+383 To Km Ist. 1+917. Basic Scope: Modernization And Construction Of Line No. 38 As A Double-Track On The Section: - From Existing Km 3+591 To Existing Km. 25+204, Hereinafter Referred To As The Białystok - Knyszyn Section, - Modernization And Construction Of Line No. 38 As A Double Track On The Section From Existing Km 61+061 To Existing Km. 98+800, Hereinafter Referred To As The Osowiec - Ełk Section, - Reconstruction Of Lines 515, 516 Along With Leaving Single-Track Sections: Line No. 515 On The Section From Km Ist. 1+278 To Km Ist. 1+915, Line No. 516 On The Section From Km Ist. 1+383 To Km Ist. 1+917. Together With Accompanying Infrastructure And Road Systems. The Basic Scope Covers All Industries, Excluding Elements Covered By Option Rights No. 1, 2, 3 And The Interface Option. Option No. 1: Modernization And Construction Of Line No. 38 As A Double-Track Line On The Section From Existing Km 25+204 To Existing Km 61+061, Hereinafter Referred To As The Knyszyn - Osowiec Section In All Sectors, Accompanying Infrastructure And Road Systems. Option No. 2: Preparation Of Construction And Executive Documentation And Obtaining The Necessary Administrative Arrangements And Decisions, As Well As Construction Of A Railway Viaduct With A Road System And The Necessary Infrastructure In Grajewo. Option No. 3: Preparation Of Construction And Executive Documentation And Obtaining The Necessary Administrative Arrangements And Decisions, As Well As Construction Of A Passage Under The Tracks Along With The Necessary Infrastructure Along The Street. Vienna In Białystok. Interface Option: Covers The Provision Of Services Specified In Chapter 4.14 Of Volume Iii - Pfu Expected Changes In The Scope Of Interfaces. The Entire Subject Of The Order Includes The Preparation Of The Following Elements: 1) Design Documentation: A) In The Scope Of Detailed Designs, Necessary For The Proper Performance Of All Construction Works And Obtaining All Required Opinions, Arrangements, Approvals, Conditions, Decisions And Permits Necessary For The Implementation Of The Subject Of The Order In Accordance With With The Scope Of The Order On The Basis Of Documentation Developed By The Contractor And Approved By The Ordering Party, B) Preparation Of As-Built Documentation, Including As-Built Geodetic Documentation, C) Preparation Of Appraisal Reports, If Necessary. 2) All Construction Works In Accordance With The Scope Of The Order Based On The Design Documentation Developed By The Contractor And Approved By The Ordering Party, Referred To In Point 1), And All Preparatory Works Necessary To Perform The Scope Of The Agreement And All Activities Required By Law, Including, Among Others, Works In The Scope : A) Surface And Subgrade, B) Railway Traffic Control Devices (P
|