Geothermal Power Station Construction Work – New Building Gs Sarstedt - Geothermal Power Plant. The Geothermal Probe System Is Intended To Cover An Energy Requirement Of 100 Kw. The Final Pulling Power Is Determined At 73 Kw. An Exploratory Drilling With Thermal Response Test And A Drilling Field Simulation Were Carried Out In Advance To Determine The Drilling Size And Depths. The Exploratory Drilling Must Be Integrated Into The System To Be Built Here And Piped.