Part No. 1 – Thermal Modernization Of The Building At Ul. Kraszowicka No. 32 In Świdnica: The Subject Of The Order For Part No. 1 Is The Thermal Modernization Of The Municipal Building At Ul. Kraszowicka No. 32 In Świdnica. The Order Includes, Among Others: Performing The Following, Among Others: Works: • Securing The Construction Site And Organizing The Construction Facilities, • Preparing The Base Of The External Walls And Insulating The External Walls With Polystyrene, • Making Thin-Layer System Plasters (Silicate) On The Prepared Base, • Preparing The Base Of The Plinth And Insulating The Plinth With Styrofoam, • Preparing The Colors Of The Facade, • Insulating The Ceiling Above The Basement And The Flat Roof With Mineral Wool, • Demolition Of The Existing Roofing Tiles, Including Battens, • Replacement Of The Entire Roof Covering With Ceramic Tiles (Plain Tiles Arranged In A Lacing Pattern) Along With Strengthening The Wooden Trusses, Insulating The Roof Slope With Mineral Wool With Wind Insulation, Installation Of Battens And Counter-Battens, Window Hatches, Chimney Sweep Benches, • Replacement Of Sheet Metal Flashings ( Zinc Sheet Or Galvanized Steel), Gutters And Downpipes, • Renovation Chimneys Above The Roof Slope, • Implementation Of A Lightning Protection System, • Replacement Of External Window Joinery, Including Replacement Of External And Internal Window Sills, Comprehensive Processing Including Installation Of Window Vents, As Well As Replenishment Of Plasters And Painting Inside The Premises (Applies To The Wall With A Window), • Replacement Of Joinery External Door Including Processing, • Comprehensive Renovation Of The Staircase, Including Replacement Of The Electrical Installation And Accessories, Painting Of Walls And Ceilings, Repair Stairs And Laying The Carpet.• Adapting The Entrance To The Facility To The Needs Of Disabled People. The Contractor Will Also Be Obliged, Among Others, To: To:• Clean Up The Construction Site;• Remove And Dispose Of Waste And Other Materials Originating From The Construction Site At Your Own Expense;• Provide, At Your Own Expense, All Materials, Devices, Energy Carriers, And Other Elements Necessary To Complete The Subject Of The Order;• Carry Out The Necessary Acceptances And Possibly Measurements And Other Works Necessary For The Proper Implementation And Completion Of This Order; • Making Appropriate Notifications On Behalf And For The Benefit Of The Ordering Party To The Relevant Entities And Authorities. A Detailed Description Of The Subject Of The Order Is Included In: - Construction Design. - Stwiorb-Ach. - Auxiliary Bills Of Quantities. - Substantive Documents, Including: Audit, Technical Opinion. - Draft Contract. The Subject Of The Order Will Be Performed On The Used Facility. The Organization Of The Construction Site And The Conduct Of Works Must Take Into Account The Functioning Of The Facility. Construction Works Must Be Carried Out With Particular Care, In Accordance With Construc
|