The Subject Of The Order Includes The Execution Of The Subject Of The Order Are Internal Renovation Works In The Ug Building In Cewice. The Scope Of The Subject Of The Order Includesa) New Paint Coatings Of Walls And Ceilings, Including Filling, Leveling And Removal Of Defects, B) Installation Of Pipes Vertically And Horizontally (Under The Ceiling). Made Of Plasterboards On A Metal Frame, C) Replacement Of Some Doors, D) Cleaning Of Existing Mosaic Plaster Coatings Along With Filling In Trace Losses,E) Replacement Of Floors In Designated Rooms (Installation Of Floor Panels With A Minimum Abrasion Class Of Ac4 / Terracotta/Tiles)F) Replacement Of Ventilation Grilles Throughout The Facility,G) Disassembly Of Wall Bumpers And Construction Of New Wall Bumpers,H) Installation Of Fixtures Lighting,I) Replacement Of Sockets And Electrical Switches In All Rooms Of The Ug Building,J) Carrying Out Other Works In Accordance With The Bill Of Quantities And Design. The Detailed Scope Of Works Includes The Construction And Executive Design And The Bill Of Quantities. The Contractor Is Obliged To: 1. Appropriately Secure The Construction Site.2. Ensuring The Safety Of The Organization Of Works On The Construction Site, During The Term Of The Agreement Until The Completion And Final Acceptance Of The Works. The Work Area Itself Should Be Secured Against Access By Third Parties.3. If It Is Impossible To Carry Out Construction Works Due To Unfavorable Weather Conditions, The Building Should Be Adequately And Properly Protected Against The Negative Effects Of Weather Conditions (Precipitation, Wind Gusts, Etc.).4. Materials From Demolition Are The Property Of The Contractor And Should Be Removed From The Construction Site To The Contractors Landfill Or Landfill In Accordance With The Provisions Of The Act Of December 14, 2012 On Waste (Journal Of Laws Of 2022, Item 699). The Costs Related To Demolition, Transport And Storage (Disposal) Of Demolition Materials Are Borne By The Contractor And Are Not Subject To Separate Payment.5. In The Event Of Damage To Existing Technical Equipment In The Ug Building, The Contractor Is Obliged To Repair The Damage And Bear All Related Costs.6. Tidying Up The Construction Site.7. All Obligations Of The Contractor Are Specified In The Draft Contract Constituting An Annex To The Procedure.8. Be Especially Careful And Secure Fan Coil Units. In The Event Of Damage, The Contractor Is Obliged To Repair The Damage And Bear All Related Costs. A Detailed Description Of The Subject Of The Order Is Included In The Attachments: 1. Design Documentation.2. Bill Of Quantities.3. In Case Of Interpretation Doubts As To The Scope Of Works, The Following Order Of Documents Will Apply: A. Design Documentationb. Bill Of Quantities. Stwiorinformation Regarding Carrying Out A Site Visit. The Ordering Party Does Not Require Carrying Out A Site Visit Or Reading The Design Documentation At The Ordering Partys Headquarters. Other Information1. In Case Of Di
Contact Information
Address
Gmina Cewice,Cewice,84-312,Pomorskie,Pl636 - Słupski
Email
sekretariat@cewice.pl
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90663253
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.