General Construction Work For Pipelines – Dj-Cl-10 - Extension Of Water And Sewerage Networks In The Calarasi Area - Bechet. Ii.2.4 Description Of The Public Procurement Execution Of Works Related To The Contract Dj Cl 10 - Extension Of Water And Sewerage Networks In The Calarasi - Bechet Area, Including: Stage I - Preparation Of As Built Documentation For Existing Works (3 Months From The Date Of The Order Start) 1. Carrying Out The Cctv Inspection For The Gravity Sewer Pipes In Total Length Of About 36,943 M (4,591 M In Bechet, 7,547 M In Ostrovenni, 3,686 M In Listeava, 6,202 M In Calarasi, 3,935 M In Sarata, 10,982 M In Dabuleni), Including The Preparation Of A Technical Report On The Findings; 2. Preparation Of The As Built Documentation (Plans According To The Execution) Regarding All Existing Works (Water Supply Pipes In The Length Of Approx. 15,454 M, Sewage Pipes In The Length Of Approx. 36,943 M, Discharge Pipes In The Length Of Approx. 5,122 M, Valve Shafts, Inspection Shafts, Connection Shafts, Connections, Hydrants, Etc.). Stage Ii - Execution Of Works (24 Months From The Date Of The Start Order) Uat Ostroveni Water Supply System - Extension Of The Water Supply Network In Ostroveni With L = 1,415 M; Uat Listeava Water Supply System - Extension Of The Water Supply Network In Listeava By 5,861 M; Uat Bechet Sewerage System - Extension Of The Sewerage Network In The Town Of Bechet (L = 2,231 M), Including Connections And Visiting Homes; - Construction Of 3 New Waste Water Pumping Stations And Related Discharge Pipes (L = .... M) In Bechet, (Including Electrical Connections And Integration Into The Scada System); Uat Ostroveni Sewerage System - Extension Of The Sewerage Network In Ostoveni Town (L = 13,239 M), Including Connections And Visiting Homes; - Construction Of 6 New Waste Water Pumping Stations And Related Discharge Pipes (L = 4,757 M) In Ostroveni, (Including Electrical Connections And Integration Into The Scada System); Uat Listeava Sewerage System - Extension Of The Sewerage Network In The Town Of Listeava (L = 6,450 M), Including Connections And Visiting Homes; - Construction Of 3 New Waste Water Pumping Stations And Related Discharge Pipes (L = 1,140 M) In Listeava, (Including Electrical Connections And Integration Into The Scada System); Uat Calarasi - Localitatea Calarasi Sewerage System - Extension Of The Sewerage Network In The Locality Calarasi (L = 1,739 M), Including Connections And Visiting Rooms; Uat Calarasi - Localitatea Sarata Sewerage System - Extension Of The Sewerage Network In The Locality Of Sarata (L = 13,295 M), Including Connections And Visiting Homes; - Construction Of 4 New Waste Water Pumping Stations And Related Discharge Pipes (L = 1,579 M) In Sarata, (Including Electrical Connections And Integration Into The Scada System); Uat Dabuleni Sewerage System - Extension Of The Sewerage Network In The Town Of Dabuleni (L = 16,127 M), Including Connections And Visiting Homes; - Construction Of 2 New Wastewater Pumping Stations And Related Discharge Pipes
|