Supply, Installation, Testing And Commissioning Of Mgps Gas Pipeline System And Allied Works As Per Specifications , Front Loading Oxygen Outlets (Bs-Type) , Oxygen Flow Meters With Humidifier , Vacuum Pump (10 Hp Motor) Includinginterconnecting Pipes Etc. , Exhaust Silencer Of Vacuum Pump , Non Return Valves , Bacterial Filter , Front Loading Vacuum Outlets (Bs-Type) , Front Loading Vacuum Outlets (Bs-Type) , Ward Vacuum Unit With Regulator, Collection Jar Of 600 Ml With Bracket , Sitc Of Distribution Copper Pipe (Medical Grade) 22 Mm Od X 0.9 Mm Thick , Sitc Of Distribution Copper Pipe (Medical Grade) 15 Mm Od X 0.9 Mm Thick , Sitc Of Distribution Copper Pipe (Medical Grade) 12 Mm Od X 0.9 Mm Thick , Medical Gas Analog Area Alarm System 2 Gas Service(O2, Vacuum) For Ward Area , Medical Gas Analog Area Alarm System 3 Gas Service (O2, Vacuum, Nitrous Oxide) For Ot Area , Area Valve Service Unit 2 Gas Service(O2,Vacuum) For Ward Area , Area Valve Service Unit 3 Gas Service(O2,Vacuum, Nitrous Oxide) For Ot Area , Supply And Installationoffloor Isolation Valve: 12Mm , Supply And Installationoffloor Isolation Valve: 15Mm , Supply And Installationoffloor Isolation Valve: 22Mm , Supply And Installationoffloor Isolation Valve: 28Mm , Lp Tubing , Bed Head Panel Provision For 2 Gas Outlet (O2-1+ Vac-1) With 5 Amp Switch & Sockets , Supply Of Electrical Control Panel For Vacuum System Including Supply Of Spares Such As Contactor Coil, Relay, Timer, Electromagnet, Volmeter, Ampere-Meter Etc. As Required , Civil And Electrical Work For Repairs Of Plant Room (As Per Pwd Schedue)
|