Tender For Miscellaneous Jobs Navy Vessel Rm0807; 1 SYSTEM 1 2 Domestic fresh water system (SERVICE COST) 3 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 4 Domestic fresh water system (MATERIAL COST) 5 1.14.3 Operational checks of hydrophore controls. Calibration of all control components. Cleaning and pressure testing of hydrophores, undertake painting (if required).1. Renewal of limit switches (02)2. Running indication of fresh water pump in PDCR to be operationalised including Suction and Discharge pressure.3. Renewal of digital flow meter of all fresh water distribution line in Fwd & Aft distribution station.1.14.4 Tank level indicators for 03 in nos tank to be operationalised local as well as PDCR. 6 SYSTEM 2 7 Domestic Sea water system (SERVICE COST) 8 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 9 Domestic Sea water system (MATERIAL COST) 10 Running indication of Sea water pump in PDCR to be operationalised including Suction and Discharge pressure 11 SYSTEM 3 12 Chilled Water System (SERVICE COST) 13 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 14 Chilled Water System (MATERIAL COST) 15 1.16.4 Check operation of thermostat in the chilled water line and calibrate if required -454nos1.16.6 Check and calibrate all instrumentation and safety cut-outs in the system. Theinstrumentation should include all pressure/temperature gauges, venturimeter /rotameters in the chilled water system.1. Repair/Renewal of solenoid valves of auto filling system in all Exapansion tank (08).2. Tank level indication for TDACs as well as PDCR to be operationalised.3. Renewal of RTDs (50)4. Renewal of pressure switches (20) & Rotameters (10)1.16.10 Undertake functional checks of all RCVs. Repair/ renew defective RCVs. Check remote operation from PDCR. Repair and renew instrumentation and electrical components as required.1. Air conditioning plant chilled water temp, salinity, trip indication to be integrated with common integrated display at PDCR.2. Additional thermo pocket for temp sensor to be manufactured and installed.3. Remote operation of hydraulic valve from PDCR to be calibrated including repair of manipulator. 16 SYSTEM 4 17 Fire main system (SERVICE COST) 18 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 19 Fire main system (MATERIAL COST) 20 1.17.51.Carry out calibration of measuring instruments as per their certificates 2. Renewal of KRD relay with DANFOSS sensor. Qty-26, range-0-25bar3. Renewal of PRESSURE SWITCH (VALCOM sensor with Honey well sensor).Qty-26, range-0-25bar.4.Renewal of Hydraulic Valve open/ close Position Indication Sensor. Qty - 120 (Press/Pull type).5. Renewal of KD- MID sensors at FCPs with Honeywell sensors with Pressure indications. Qty 10 21 SYSTEM 5 22 OXYGEN PLANT (SERVICE COST) 23 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 24 OXYGEN PLANT (MATERIAL COST) 25 1.25.2 Carry out calibration/ checks of all safety devices fitted in the system as well as on sub-assemblies. Upgradation of control panel with replacement of heater assembly 26 SYSTEM 6 27 Chemical Fire Smothering System (07 stations) (SERVICE COST) 28 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 29 Chemical Fire Smothering System (07 stations) (MATERIAL COST) 30 1.18.5 Check automatic and remote start of system without HALON release from the extinguishers 31 SYSTEM 7 32 Foam Fire Fighting System (SERVICE COST) 33 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 34 Foam Fire Fighting System (MATERAIL COST) 35 1.19.6.Carry out maintenance of measuring instruments as per theircertificates. - 100Nos1.19.9 Carry out refurbishment/ replacement of control replay board outer cover.- 1 System1.19.10 Overhauling/ Replacemet of defective pressure sensor - 1 System 36 SYSTEM 8 37 Drainage Pump (SERVICE COST) 38 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 39 Drainage Pump (MATERIAL COST) 40 1.20.3. Calibrate all instrumentation. Undertake survey of clamping of complete system. Repair/ renew as necessary. 41 SYSTEM 9 42 Bekas (Work Boat) ( SERVICE COST) 43 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 44 Bekas (Work Boat) ( MATERIAL COST) 45 1.29.2.3 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. 46 SYSTEM 10 47 OFB (Officers Boat) (SERVICE COST) 48 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 49 OFB (Officers Boat) (MATERIAL COST) 50 1.30.4.2 Carry out cabling, calibration of instrumentation panel/ console and instrumentation checks. Qty - 02 51 SYSTEM 11 52 GAS ANALYSER FOR FUEL & OXYGEN (SERVICE COST) 53 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 54 GAS ANALYSER FOR FUEL & OXYGEN (MATERIAL COST) 55 Carryout following annual routines on gas analyser.Qty-041.86.1 Inspect oxygen sampling pump membrane and replace if required 1.86.2 Calibration of gas detectors .1.86.3 Inspect avcat sampling pump membrane and replace if required . 56 SYSTEM 12 57 Electromagnetic bleed valve (SERVICE COST) 58 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 59 Electromagnetic bleed valve (MATERIAL COST) 60 Electromagnetic bleed valve of venilation system malfunctioning. Overhauling of bleed valve to be carried out. Qty- 30 61 SYSTEM 13 62 Resistor-E (SERVICE COST) 63 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 64 Resistor-E (MATERIAL COST) 65 3.30.9. Serviceability check/calibration of 07 in number temperature sensor and sensor cable of radar beacon, secondary radar, localizer beacon, and glide Scope beacon, approach control system 1 and 2 ofof rezistor-e complex.Calibration ofpressure guages 12nos in each system 66 SYSTEM 14 67 Gas detection system (SERVICE COST) 68 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 69 Gas detection system (MATERIAL COST) 70 rCA-K 3.204.2 Serviceability / calibration checks of gas detection system . Renew if defective 71 SYSTEM 15 72 Vent Flap (SERVICE COST) 73 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications. 74 Vent Flap (MATERIAL COST) 75 Serviceability checks of vent flap coil auto operation at all PGRs, EPS and EBRs. Rewinding,replacement of vent flap coils, limit switches and indications.
Contact Information
Contact Person
DGM(SRM)
Address
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
View Notice Now...
Fill Detail for Getting Instant Access
Download Tender Document / Tender Notice
Dear Sir,
Warm Greetings from TenderDetail.com !!
We have received Tender Document request for the TDR No : 90609873
Tender Notice along with it's Attachments ( Tender Document / Scan Image of News Paper)
sent to your Email Address :.
Please check your email for Tender Document.