Tenders are invited for Job Order Contract For Citywide Water Resources Infrastructure Unspsc 83 Public Utilities And Public Sector Related Services: This Segment Includes Services Associated With The Supply Of Power And Water As Well As The Provision, Management Or Enhancement Of Voice Or Data Communications Such As Postal, Telex, Fax And Telephone Charges. This Segment Also Includes The Cable And Satellite Television, Installation And Service Charges Unspsc 301118 Aggregates: Inert Granular Materials That Are Combined And Solidified With Cement And Water To Make Mortar Or Concrete. Composed Of Sand, Gravel, Crushed Stone And Others. Unspsc 831015 Water And Sewer Utilities Unspsc 20111504 Water Well Drilling Equipment Unspsc 20111610 Sewer Inspection Machinery Unspsc 20111622 Reverse Circulation Drill: A Type Of Drilling Rig That Crushes Base Rock By Attaching A Special Roller Bit To The Drill Rod Block Section, And Discharges Crushed Excavated Soil To The Surface By Sucking The Circulation Water And Crushed Rock With A Vacuum Pump Through The Drill Rod Pipe. Unspsc 20111715 Well Site Pit Liner: Liner Used To Contain Water Pumped From Well Sites Until It Can Be Picked Up And Disposed Of. Simular To A Pool Liner. Unspsc 24111810 Water Storage Tanks Unspsc 27111761 Water Pump Wrench: A Type Of Wrench That Has An Unusual Stepped Opening. Unspsc 30111508 Water Permeable Concrete: Concrete For Which The Extent Of Infiltration Of Water Has Been Elevated By Forming Continuous Apertures By Mixing Cement, Crushed Aggregate, Water And Mineral Admixture. Unspsc 30181605 Drain: Plumbing Fitting Used As A Conduit To Remove Water, Or Some Other Liquid, From Somewhere That It Is Not Wanted. Unspsc 40151579 Gravity Pump: A Pump That Pulls Up To The Higher Place By Transferring Into Small Volume Of High-Pressure Liquid With The Massive Volume Of Low Pressure Liquid By Using The Water Inertia. Unspsc 40151721 Water Pump Spare Parts Unspsc 40161533 Solid Waste Filter: Type Of Filter Used For Removing Solid Particles Placed In Water Or Liquid. Unspsc 40161609 Water Purification System: Its Purpose Is The Elimination Of Pathogenic Microorganisms Contained In Water That Have Not Been Eliminated In The Initial Stages Of Water Treatment. Unspsc 41103007 Chilling Units Or Cold Water Circulators Unspsc 41104007 Water Samplers Unspsc 41104023 Water Sampler Accessories: Accessories To Water Sampling Equipment Unspsc 41104201 Water Purification Reagents Unspsc 41104205 Ultra Violet Water Purification Units Unspsc 41104206 Ultra Pure Water Systems Unspsc 41104207 Water Analysis Systems Unspsc 41104212 Water Filtration Cartridges Unspsc 41104407 Water Jacketed Single Chamber Carbon Dioxide Incubators Unspsc 41104408 Water Jacketed Dual Chamber Carbon Dioxide Incubators Unspsc 41112242 Laboratory Waterbath Thermometer: Thermometer Used For Critical Temperature Monitoring In Laboratory Water Baths Unspsc 41112418 Capillary Pressure Tester: A Tester That Measures The Capillary Tube Pressure Of Air And Water, Water And Oil, Or 3 Or More Fluids. This Equipment Is Equipped With The Mercury Pump, And It Measures The Pressure From The Time Mercury Smears Into The Sample And The Pressure When No More Smearing Can Be Made In Graph. Unspsc 41112422 Hydraulic Pressure Tester: A Device That Tests The Durability By Applying The Water Pressure When Confirming The Condition Of Instrument, Such As Water Pipe, Tank, Boiler, High Pressure Gas Container And Others With The Applied Pressure. Unspsc 41113823 Specimen Expansion Tester: A Tester That Is Designed To Measure The Expansion Height Following The Time Lapse For 96 Hours As It Is Dipped In Water With The Defined Load On The Earth Specimen Produced With The Pounding On Mold. Unspsc 72141120 Sewer Line Construction Service: The Building Of Sewer Lines Owned By Others Unspsc 81101527 Wastewater Engineering: The Design Of Wastewater Systems -Sanitary Sewer And Grey Water- Is The Design Of A Closed Network Of Pipes, Buffer Chambers, Pumping Stations And Sewage Treatment Plants. These Are Used To Remove Wastewater From Human Activity And Treat The Wastewater To Unspsc 81101528 Stormwater Engineering: The Design Of Stormwater Systems For Removal Of Surface Water To Prevent Flooding. Urban Areas Have Many Impermeable Surfaces Which Tend To Concentrate Water. The Stormwater Systems Collect Water Via Channels, Culverts, Pipes, Drainage Reserves, Settling Unspsc 81141807 Plumbing Or Sewer Inspection Service Unspsc 83101501 Supply Of Water Unspsc 121652 Water Treatment: Water Treatment Including Potable Water, Desalinization Water, And Deionized Water. Unspsc 12165201 Non-Potable Water: Non-Potable Water. Unspsc 25202610 Microfilters: Microfilters Are Used As Pre-Filters For The Efficient And Continuous Removal Of Solids Such As Rust, Sand And Other Particulates From Aviation Fuels. Aviation Microfilters Are Used In Refineries, Terminals And Airport Depots, Primarily As Pre-Filters To Lengthen The Service Life Of Downstream Coalescer Elements In Filter/Water Separators. Unspsc 30181518 Water Distribution Tap Stand: Water Distribution Ramp, 6 Tap Stands (Self-Closing) / 1 Ramp Can Provide Water For 1500 To 3000 People. System For The Distribution Of Drinking Water In Refugee Camps And Small Structures. Dont Forget To Level The Distribution Area, Ensure Proper Drainage Around The Distribution Point, And Disposal Of The Waste Water. Cast Concrete Apron Under The Ramp Is Optimal. To Connect To A Bladder Tank (Gravity System) Up To 3 Ramps In Series. Pallet Of 10 Units: 1.20 X 0.80 X 0.64 M 298 Kg. Unspsc 40151588 Industrial Pumps: Industrial Pumps Are Designed Specifically For Use In Harsh Or Heavy-Duty Applications. They Move A Range Of Material Types, Including Water And Wastewater, Chemicals, Oil, Petroleum, Sludges And Slurries, And Food. Unspsc 81103408 Procurement Services Provided By Epc Contractor: Engineering, Procurement, And Construction Services Provided By An Epc Contractor For Large-Scale Projects, Including Oil And Gas Facilities, Power Plants, And Infrastructure Projects, From Design And Engineering To Procurement And Construction. As A Single Point Of Responsibility, The Contractor Takes Care Of All Design, Engineering, Procurement, Construction, Commissioning And Testing Activities, And Ensures That The Whole Project Is Completed On Time
|