Quotation Are Invited For Removal Of Existing Fire Alarm System And Design, Supply, Installation, Testing And Commissioning Of New Fire Alarm System. Removal Of Existing Fire Alarm System And Design, Supply, Installation,Testing And Commissioning Of New Fire Alarm System In Skln 13 2Kvsubstations.1.0.#Scope:1.1.#Removal Of Existing Fire Alarm Control Panel, Repeater Panel,Mimic Panel, All Field Devices, Micc Cab Les, Fittings And Replacing Withnew Fire Alarm System At Skln 132Kv Substation.1.2.#The Scope Of Work Includes The Supply, Design, M Anufacturing, Fat,Transport To Site, Installation, Site Testing, Commissioning, Andhanding Over In Satisfactory Operating Condition Of New Fire Alarmsystem.2.0.#Exisitng Fire Alarm System:2.1.#The Existing Fire Alarm System Is Analogue Addressable Type Withmicc Ca Bling For Entire Substation Including External Area Ofsubstation, Fire Water Tanks, Fire Pump Room And Auxiliary Buildings Atskln 13 2 Kv Substation.2.2.#Micc Cables Between The Building Through Underground Sleeves,Conduits, Trunking Etc.3.0.#Work Description:3.1.# Design, Supply And Installation, Testing And Commissioning Of Firealarm System As Per Fps Technical Specification 1548501-Rev-1.3.2. #The Fire Alarm System For Skln 132Kv Substation Shall Be Analogueaddressable Type Including But Not Limited To Analogue Addressable Firealarm Control Panel, Repeater Panel, Mimic Panel, Extinguishing Controlpanel, Field Devices, Interfacing With Other Services, S Cada Signals,Fire Rated Cables, Fittings As Per Approved Design Drawings.3.3.#Contractor To Carry Out All The Necessary Modification Required Inthe Existing Site Condition In Order To Have Interface Other Services,Fixing Supports, Installation Of Devices And Exist Ing Related Servicesas Per Construction Requirements And To Establish The Connections To Thenew Installed Fire Alarm System. All The Modification And New Designdrawings, Calculations Of New Fire Alarm System Shall Be Submitted Fordewa Approval.3.4.#The Fps Work Sh All Be Carried Out In Accordance With Fireprotection Specification 1548501 Rev 1.3.5.#Contractor To Interface The New Fire Alarm Sys Tem With All Theexternal Device Contacts In Fire Pump Room, Fire Water Tanks, Includingfire Pump Signals, Low Level, Low Low And Hig H Level Float Switches,Supervisory Switches, Pressure Switches, Flow Switch, Hvac Shutdown,Transformer Cooling Fan Shutdown And Othe R Available Services At Site.3.6.#All Associated Civil Works Such As Excavation,Trial Pit Foridentifying Underground Services, Back Filling, Concrete Trench, Pullpit, Concrete Supports, Core Cutting, Wall Openings, Protection Sleevesand Fire Sealing Of Openings, P Ainting Etc. As Per Site Condition.3.7.#All The Openings, Sleeves Between Floors And Across The Wall Shallbe Sealed With Fire Sealan T As Per Dewa Specification.3.8.#Excavation Shall Be Protected Against Sliding And Caving In Wherenecessary By Embankment, Shoring, Sheet Piling, Etc. Subject To Dewaapproval, With Full Coordination Of Underground Services.3.9.#Contractor Shall Provide Fire Alarm Control Panel, Repeater Panel,Mimic Panel, Extinguishing Control Panel, Field Devices, Cabling,Fittings As Per Fps Specification App Roved By Dewa.3.10.#Contractor Shall Submit The Design Drawings Of New Fire Alarmsystem, Interlocks With Other Services, Interfacing With Existingservices Based On Fps Specification, Dcd Codes To Obtain Dewa Approvalprior To Start Any Work At Site.3.11.#The Associ Ated Interfacing And Interlock With Other Servicesshall Be Provided As Part Of The Scope.3.12.#The Location Of Detectors, Manual Cal L Points, Interface Modulesshall Be Based On The Feasible Locations, Nfpa Requirement And Sitecondition And Approved Drawings.3.13. #The Attached As Built Drawing Shall Be Used For Reference Onlyand Not To Copy The Same Design. In Case If The As Built Drawing Nota Vailable, Contractor To Make Site Survey And Prepare The Drawing Asrequired. Qty: 1 Replacement Of Fire Alarm Cables Qty: 1 Standard Terms & Conditions 1) Prices Should Be Ddp Delivery Duty Paid At Dewa Stores. 2) Quotation To Be Submitted Only In Local Currency U.A.E Dirhams 3) Dewa Standard Payment Terms Is 30 Days Credit From The Date Of Acceptance Of Material 4) No Dewa Staff Or His Or Her Relatives Up To Third Degree Should Have Ownership Or Partnership In Your Company, And Your Participation In Dewa Tenders / Rfqs Should Not Constitute A Conflict Or Perceived Conflict Of Interest. Supplier Registration: Https://Srm.Dewa.Gov.Ae/Irj/Portal/Anonymous/Regis Tender Link : Https://Srm.Dewa.Gov.Ae/Sap/Opu/Odata/Sap/Zsrm_Rfx_Reg_Bid_Srv/Attachmentset(2412402006)/$Value
|