4.1.1. Part 1 Of The Order - Superstructure, Reconstruction And Renovation Of The Water Treatment Plant Building Along With The Installation Of Two Above-Ground Water Tanks In Huta Krzeszowska. The Building Is Equipped With The Following Internal Installations: - Electricity, - Water Supply, - Sewage, - Gravity Ventilation, - Lightning Protection. The Scope Of Works Includes, In Particular: A) Dismantling Works: Disassembly Of: Lightning Protection System, Sheet Metal Work, Roofing Felt Made Of Roofing Felt With Insulating Layers, I.E. Roofing Felt, Plaster On A Mesh, Polystyrene, Sawdust Concrete + Sand, Roofing Felt, Steel Gutters And Downpipes, Steel Ladder Mounted In The Side (Top) Façade, All Windows External And Internal Doors With Window Sills, External And Internal Doors With Frames, Sanitary Facilities, Devices In The Suw - Systematic And Allowing For A Continuous Supply Of Water To The Water Supply Network And Electrical Switchboard, - Removal Of Floor Coverings And Plinths, - Removal Of Damp External And Internal Plasters, - Dismantling Of The Concrete Band Around The Building, - Demolition Of A Hole In The Ceiling In Order To Install A Hatch On The Designed Unusable Attic, Demolition Of Partition Walls Of The Room Toilet, - Demolition Of A Fragment Of The Wall Between The Corridor And The Duty Room In Order To Move The Door Opening, - Disassembly Of: The Roof Over The Entrance, Steel Fence With The Entrance Gate And Wicket, Clean Water Tanks. B) Construction Works: - Waterproofing Of Foundations And Insulation, - Execution Wooden Roof Truss Structure, Installation Of Full Formwork For Flat Sheet Metal, - Installation Of Windproof Insulation Made Of A Membrane, - Overlaying Chimneys From The Level Of The Flat Roof Above The Designed Roof, - Insulating Chimneys From The Level Of The Flat Roof, - Applying Plaster On Chimneys, - Installing External Chrome-Nickel Chimney Grilles, - Carrying Out Flashings For Chimneys And Chimney Caps Made Of Coated Flat Sheet Metal. In The Color Of The Roof Covering, Installation Of Gutters And Pipes Steel, System Drains, In The Color Of The Roof Covering, - Installation Of A New Standing Seam Flat Sheet Metal Roof Covering, Installation Of A Pvc Soffit, - Installation Of: System Roof Hatch, System Snow Guards, Sheet Metal Flashings, Lightning Protection Installation, - Installation Of Ceiling Insulation In The Entire Attic By Laying Mineral Wool, - Making A Hole In The Ceiling Above The Ground Floor And Installing Beams Steel, - Making Epoxy Resin Floor Coverings In The Main Room Of The Water Treatment Plant, Auxiliary Workshop And Warehouse, - Making Stoneware Floor Coverings In The Duty Room, Chlorination Room, Corridor And Toilet, - Making Wall Coverings With Ceramic Or Stoneware Tiles, - Making A New Partition Wall For The Toilet Room, - Construction Of A Lintel In Internal Wall, - Bricking Up Part Of The Openings In The Internal Walls, - Replenishing Plaster In The Rooms And Painting All Internal Wa
|